Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes drainage channel improvements include the installation of: turf reinforcement mat in the basin behind the costco store, and "hydroturf" in the existing channel to protect side slopes and reduce erosion.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide drainage channel Ph.2. Contract documents includes the following: sitework, landscape & irrigation.
Posted Date
Dec 2, 2025
Due Date
Jan 12, 2026
Release: Dec 2, 2025
Close: Jan 12, 2026
Provide drainage channel Ph.2. Contract documents includes the following: sitework, landscape & irrigation.
AvailablePremium
Access the largest public sector contact database
Work includes repair concrete trapezoidal channel invert and a concrete rectangular channel side wall and bracing of splitter wall.
Posted Date
Dec 6, 2025
Due Date
Jan 13, 2026
Release: Dec 6, 2025
Close: Jan 13, 2026
Work includes repair concrete trapezoidal channel invert and a concrete rectangular channel side wall and bracing of splitter wall.
AvailableChannel 1 repair.
Posted Date
Nov 30, 2025
Due Date
Dec 19, 2025
Release: Nov 30, 2025
Close: Dec 19, 2025
Channel 1 repair.
AvailableModification of an existing channel to adjust the slope. The objective of this project is to increase the slope of the 30’ L x 26” W, steel/Plexiglas channel from 7% to 10%. The channel also includes a pneumatic bed that is raised/lowered into the bottom of the channel, and this will also need to be adjusted as part of the modification to the channel. The modifications require that the top of the channel remain unchanged, due to its location and entry port for water used during testing. Any modifications require that the top section of the channel remain watertight with the water entry feed.
Posted Date
Dec 5, 2025
Due Date
Jan 5, 2026
Release: Dec 5, 2025
Close: Jan 5, 2026
Modification of an existing channel to adjust the slope. The objective of this project is to increase the slope of the 30’ L x 26” W, steel/Plexiglas channel from 7% to 10%. The channel also includes a pneumatic bed that is raised/lowered into the bottom of the channel, and this will also need to be adjusted as part of the modification to the channel. The modifications require that the top of the channel remain unchanged, due to its location and entry port for water used during testing. Any modifications require that the top section of the channel remain watertight with the water entry feed.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis