Retrieving RFP details
Release
Close
City of Gaithersburg
Work includes side walk (removal and replacement), paver sidewalks, other associated works as listed on the schedule of prices, curb and gutter, paving. Maintenance of traffic; 600 lf temporary orange construction fence; 20 cy test pit excavation; 750 lf full depth saw cut; 5 lf "gutterbuddy" or approved equal; 60 sy remove, dispose & replace concrete sidewalk & wheelchair ramps (mc-110.01/.02); 4,100 sf remove (wavy), dispose & replace brick (belden pawnee blend) sidewalk (mc-111.02); 60 sy concrete sealant for curb, gutter and sidewalks; 30 cy furnish & install cast-in-place concrete - slot mix; 18 ea adjust existing water valves, sewer manholes; general excavation; 100 lf remove, dispose & replace concrete curb & gutter (all types-any height). See outside link.
City of Gaithersburg
Provide professional engineering, surveying and subsurface utility engineering (sue) services to improve pedestrian safety in the area especially for pedestrians to and from the train station. Design a new traffic signal. Evaluate installation of signal head for southbound traffic. Evaluate the installation of an additional crosswalk to the north of the tracks with ada ramps. Evaluate southside of the track relocate existing crosswalk with ada ramps on both ends and associated curb extension. Evaluate removal of the existing rectangular rapid flashing beacon (rrfb). Evaluate and design installation of pedestrian pushbuttons at the crosswalks north and south of the railroad tracks. See outside link.
Town of Severance
Project includes the following work: new sidewalk construction and signal installation including removals, earthwork, grading, concrete sidewalk, pedestrian curb ramps, asphalt patching, signing, pavement markings, and drainage improvements within town of severance right of way.
City of Mobile
Work includes construction of curb ramps and sidewalk improvements.
Release
Sep 23, 2025
Close
Oct 29, 2025