Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seeking from nve 2025 - tenabo switching station build (sppc).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Line Rebuild North Truckee to Summit (SPPC).
Posted Date
Nov 4, 2025
Due Date
Jan 16, 2026
Release: Nov 4, 2025
Close: Jan 16, 2026
Line Rebuild North Truckee to Summit (SPPC).
AvailablePremium
Access the largest public sector contact database
Provide 56MVA, 13.8/72.49 kV GSU transformer for Olive A3 switching station.
Posted Date
Oct 29, 2025
Due Date
Jan 19, 2026
Release: Oct 29, 2025
Close: Jan 19, 2026
Provide 56MVA, 13.8/72.49 kV GSU transformer for Olive A3 switching station.
AvailableDesign-build: Work includes north transfer station canopy & floor design build.
Posted Date
Oct 28, 2025
Due Date
Dec 12, 2025
Release: Oct 28, 2025
Close: Dec 12, 2025
Design-build: Work includes north transfer station canopy & floor design build.
Sealed bids are requested for furnishing a 34.5 – 12.47 / 7.2 kV switching station to be performed in Elizabeth City, North Carolina; proposals are due for public opening and reading on December 18, 2025. The contract requires standard bidding security (5% bid bond or certified check), a 100% performance bond upon award, and contract documents are available from Progressive Engineering Consultants, Inc.
Posted Date
-
Due Date
Dec 18, 2025
Close: Dec 18, 2025
Sealed bids are requested for furnishing a 34.5 – 12.47 / 7.2 kV switching station to be performed in Elizabeth City, North Carolina; proposals are due for public opening and reading on December 18, 2025. The contract requires standard bidding security (5% bid bond or certified check), a 100% performance bond upon award, and contract documents are available from Progressive Engineering Consultants, Inc.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis