Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project involves the removal of existing systems and installation of a new Rauland nurse call system, including patient and staff stations, dome lights, network risers, cabling, and supporting infrastructure. Construction will take place within active patient care areas, including SICU, L&D/NICU, and medical/surgical units, requiring strict adherence to OSHPD/HCAI requirements, infection control, and hospital safety protocols. The facility is a Type I, fully sprinklered, 11-story, fire-resistive hospital, classified as an I-2 occupancy, with seismic compliance (NPC-2, SPC-2) governing equipment supports. Contractors must coordinate closely with hospital staff to ensure uninterrupted operations, maintain life safety systems and emergency access at all times, and perform work in a phased manner to minimize disruption in occupied healthcare environments.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
OCH Nurse Call System Upgrade Project.
Posted Date
Sep 22, 2025
Due Date
Jan 8, 2026
Release: Sep 22, 2025
Close: Jan 8, 2026
OCH Nurse Call System Upgrade Project.
AvailableProvide architect/Engineer (A/E) design services for upgrade nurse call system.
Posted Date
Nov 26, 2025
Due Date
Jan 6, 2026
Release: Nov 26, 2025
Close: Jan 6, 2026
Provide architect/Engineer (A/E) design services for upgrade nurse call system.
AvailableThe Department of Veterans Affairs (VISN 10) issued a presolicitation requesting SF-330 submittals for Architect/Engineer (A/E) design services to upgrade the Nurse Call System at the Chillicothe VA Medical Center. This acquisition is a 100% SDVOSB set-aside, with an estimated construction magnitude between $500,000 and $1,000,000 and a period of performance of 330 calendar days. SF-330 packages must be emailed to the contracting specialist by January 6, 2026, 2:00 PM ET.
Posted Date
Nov 26, 2025
Due Date
Jan 6, 2026
Release: Nov 26, 2025
Close: Jan 6, 2026
The Department of Veterans Affairs (VISN 10) issued a presolicitation requesting SF-330 submittals for Architect/Engineer (A/E) design services to upgrade the Nurse Call System at the Chillicothe VA Medical Center. This acquisition is a 100% SDVOSB set-aside, with an estimated construction magnitude between $500,000 and $1,000,000 and a period of performance of 330 calendar days. SF-330 packages must be emailed to the contracting specialist by January 6, 2026, 2:00 PM ET.
HVAC upgrades provide and install mini split units for classrooms, offices, and hallways. 1. Install f variable refrigerant flow (VRF) heat recovery systems. 2. All indoor fan coil units will be cassette type ceiling-mounted. 3. Each room will have ceiling cassette for cooling comfort and individual room control.
Posted Date
Dec 12, 2025
Due Date
Jan 23, 2026
Release: Dec 12, 2025
Close: Jan 23, 2026
HVAC upgrades provide and install mini split units for classrooms, offices, and hallways. 1. Install f variable refrigerant flow (VRF) heat recovery systems. 2. All indoor fan coil units will be cassette type ceiling-mounted. 3. Each room will have ceiling cassette for cooling comfort and individual room control.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis