Retrieving RFP details
Release
Close
City of Cedar Rapids
Work generally consists of demolition of two (2) lime slakers and aging tanks, installation of two (2) new slakers and aging tanks, relocation of two (2) lime slurry pumps and related equipment, removal and replacement of eight (8) load cells for the lime silos, removal and replacement of two (2) lime silo activators, installation of water heaters for the lime slakers and all related appurtenances.
City of Escanaba
Boiler replacement for water treatment plant.
City of Westminster
This project includes the repair, replacement, and improvement of infrastructure at the Northwest Water Treatment Facility (NWTF) and Semper Water Treatment Facility (SWTF). The primary goal of this project is to upgrade process equipment, structural elements, and supporting infrastructure to extend the operational lifespan of the City’s two water treatment facilities and support their long-term performance and reliability.
City of Dania Beach
Work includes water treatment plant chemical feed system replacement involves three sections of the water treatment plant: the membrane filtration system, the disinfection process of the raw water supply, and the control boxes for the four-gravity fed multi-layer media filters after the softening process.
Release
Oct 08, 2025
Close
Nov 05, 2025