Retrieving RFP details
Release
Close
City of Escanaba
Boiler replacement for water treatment plant.
boiler_replacement_for_water_treatment_plant
City of Dania Beach
Work includes water treatment plant chemical feed system replacement involves three sections of the water treatment plant: the membrane filtration system, the disinfection process of the raw water supply, and the control boxes for the four-gravity fed multi-layer media filters after the softening process.
Town of Ayer
The Work consists of removal and replacement of GAC (Granulated Activated Carbon) media of one (1) existing GAC filter at the Spectacle Pond Water Treatment Plant.
Town of Bruceton
Project consists of replacing the existing high service pumps at the water treatment plant and providing SCADA and chlorine and turbidity monitoring capability.
Release
Sep 26, 2025
Close
Nov 11, 2025