Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
New River Solid Waste Association
Replace equipment at the landfill gas flare at the Regional Landfill, Class I Landfill. At a minimum, two Variable Frequency Drives and possibly two blower motors will require replacement.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
County of San Bernardino
The scope of work includes site grading and preparation, construction of concrete foundations, modification of existing LFG piping, and installation of new LFG piping and electrical infrastructure. The project also includes the construction of a new LFG flare station equipped with two (2) Perennial Energy low NOx enclosed ground flares, LFG blowers.
Posted Date
Nov 28, 2025
Due Date
Dec 9, 2025
Release: Nov 28, 2025
County of San Bernardino
Close: Dec 9, 2025
The scope of work includes site grading and preparation, construction of concrete foundations, modification of existing LFG piping, and installation of new LFG piping and electrical infrastructure. The project also includes the construction of a new LFG flare station equipped with two (2) Perennial Energy low NOx enclosed ground flares, LFG blowers.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
King County
Replace and reconfigure the 4 Interior Header for the landfill gas collection system at Cedar Hills Regional Landfill. The work includes decommissioning of existing HDPE piping, installation of new HDPE piping, excavation, geosynthetic repair/restoration, installation of valve assemblies, condensate, and well head controls, stormwater piping, and surface restoration.
Posted Date
Nov 7, 2025
Due Date
Dec 4, 2025
Release: Nov 7, 2025
King County
Close: Dec 4, 2025
Replace and reconfigure the 4 Interior Header for the landfill gas collection system at Cedar Hills Regional Landfill. The work includes decommissioning of existing HDPE piping, installation of new HDPE piping, excavation, geosynthetic repair/restoration, installation of valve assemblies, condensate, and well head controls, stormwater piping, and surface restoration.
AvailableDelaware County Solid Waste Authority
Work includes installation of fourteen vertical landfill gas wells, one condensate knockout station, landfill gas (LFG) header and laterals pipes, and all associated piping fixtures to facilitate proper tie-in to the existing LFG system.
Posted Date
Nov 3, 2025
Due Date
Dec 5, 2025
Release: Nov 3, 2025
Delaware County Solid Waste Authority
Close: Dec 5, 2025
Work includes installation of fourteen vertical landfill gas wells, one condensate knockout station, landfill gas (LFG) header and laterals pipes, and all associated piping fixtures to facilitate proper tie-in to the existing LFG system.
AvailableHorry County Solid Waste Authority
Receive bids for the Landfill Gas Blower Station Upgrade Project.
Posted Date
Oct 30, 2025
Due Date
Dec 3, 2025
Release: Oct 30, 2025
Horry County Solid Waste Authority
Close: Dec 3, 2025
Receive bids for the Landfill Gas Blower Station Upgrade Project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →