Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes new main entrance sign at road frontage and at the entrance of our main clubhouse.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
New Clubhouse Building.
Posted Date
Nov 18, 2025
Due Date
Dec 18, 2025
Release: Nov 18, 2025
Close: Dec 18, 2025
New Clubhouse Building.
AvailablePremium
Access the largest public sector contact database
Operate year-round food and beverage service concession within its new clubhouse facility.
Posted Date
Nov 5, 2025
Due Date
Dec 28, 2025
Release: Nov 5, 2025
Close: Dec 28, 2025
Operate year-round food and beverage service concession within its new clubhouse facility.
AvailableSealed proposal for Construction Management Services (CM) for the Middle High School. The project consists of an interior renovation of an existing school main office facility. The core renovation area is roughly 2239 SQ. FT. The project scope will include - Select demolition of existing walls, doors, ceilings, windows, flooring, and built-in furniture in the current main office, teachers’ room, and classroom 202. Renovate the spaces by adding walls, doors (interior and exterior), ceilings, windows, flooring, and built-in reception desk. The Guidance office room 201B wall will be demo’d and expanded. Trades work will match existing systems that include electrical, plumbing HVAC, Fire system, Sprinkler system, moving of security viewing monitors, intercom system, data wires, and cabling. The vestibule will receive a hardened safety wall and glass protection.
Posted Date
Oct 28, 2025
Due Date
Dec 15, 2025
Release: Oct 28, 2025
Close: Dec 15, 2025
Sealed proposal for Construction Management Services (CM) for the Middle High School. The project consists of an interior renovation of an existing school main office facility. The core renovation area is roughly 2239 SQ. FT. The project scope will include - Select demolition of existing walls, doors, ceilings, windows, flooring, and built-in furniture in the current main office, teachers’ room, and classroom 202. Renovate the spaces by adding walls, doors (interior and exterior), ceilings, windows, flooring, and built-in reception desk. The Guidance office room 201B wall will be demo’d and expanded. Trades work will match existing systems that include electrical, plumbing HVAC, Fire system, Sprinkler system, moving of security viewing monitors, intercom system, data wires, and cabling. The vestibule will receive a hardened safety wall and glass protection.
AvailableProvide water main replacement and relocation services. This project consists of relocating water main in multiple locations. The construction of 595 LF of 12", and 205 LF of 8" ductile iron water main, removal of 165' of 6" AC watermain, 1 hydrant assembly and appurtenances and other work.
Posted Date
Nov 21, 2025
Due Date
Dec 16, 2025
Release: Nov 21, 2025
Close: Dec 16, 2025
Provide water main replacement and relocation services. This project consists of relocating water main in multiple locations. The construction of 595 LF of 12", and 205 LF of 8" ductile iron water main, removal of 165' of 6" AC watermain, 1 hydrant assembly and appurtenances and other work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis