Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
New Hartford Central School District
Project includes sitework, general trades, plumbing, mechanical and electrical construction contracts to perform the work associated with the phase 2 capital project. See attached file.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
County of Napa
The County of Napa (for the Lake Berryessa Resort Improvement District) is soliciting bids for the Phase 2 Wastewater Ponds Rehabilitation Project (LB 18-02), including vegetation removal, demolition and replacement of piping/structures, reconstruction of pond dikes, and installation of new gravity mains and related appurtenances. This is an Invitation for Bid with a mandatory pre‑bid site visit on December 2, 2025, and bids due December 18, 2025 at 11:30 AM PT via the County’s e‑Procurement portal.
Posted Date
Nov 10, 2025
Due Date
Dec 18, 2025
Release: Nov 10, 2025
County of Napa
Close: Dec 18, 2025
The County of Napa (for the Lake Berryessa Resort Improvement District) is soliciting bids for the Phase 2 Wastewater Ponds Rehabilitation Project (LB 18-02), including vegetation removal, demolition and replacement of piping/structures, reconstruction of pond dikes, and installation of new gravity mains and related appurtenances. This is an Invitation for Bid with a mandatory pre‑bid site visit on December 2, 2025, and bids due December 18, 2025 at 11:30 AM PT via the County’s e‑Procurement portal.
AvailableCity of Superior
Qualified contractors for the Fiber Phase 2 Construction Project. The work under this project generally consists of building the necessary components to create the high-speed Fiber-To-The-Premise (FTTP) Optical Network (XGS-PON) communications Network (the Project) within the City’s defined service area and preparing it to deliver fiber-to-home services. The system shall be a fully operations high-speed communications network supporting Internet protocol technology and allowing users access to and from the Internet.
Posted Date
Nov 6, 2025
Due Date
Dec 16, 2025
Release: Nov 6, 2025
City of Superior
Close: Dec 16, 2025
Qualified contractors for the Fiber Phase 2 Construction Project. The work under this project generally consists of building the necessary components to create the high-speed Fiber-To-The-Premise (FTTP) Optical Network (XGS-PON) communications Network (the Project) within the City’s defined service area and preparing it to deliver fiber-to-home services. The system shall be a fully operations high-speed communications network supporting Internet protocol technology and allowing users access to and from the Internet.
AvailableCity of Crystal Lake
Phase 1: Installation/relocation of all impacted underground utilities (storm sewer, sanitary sewer, water main), installation of the far upstream and downstream reinforced concrete box culverts (RCBC) and headwalls, Soil Erosion/Sediment Control measures, and all necessary restoration. Phase 2: Installation of the remaining proposed reinforced concrete box culverts (RCBC) and headwalls, proposed creek grading and appurtenances for stabilization, Soil Erosion/Sediment Control measures, and all necessary restoration.
Posted Date
Oct 13, 2025
Due Date
Dec 4, 2025
Release: Oct 13, 2025
City of Crystal Lake
Close: Dec 4, 2025
Phase 1: Installation/relocation of all impacted underground utilities (storm sewer, sanitary sewer, water main), installation of the far upstream and downstream reinforced concrete box culverts (RCBC) and headwalls, Soil Erosion/Sediment Control measures, and all necessary restoration. Phase 2: Installation of the remaining proposed reinforced concrete box culverts (RCBC) and headwalls, proposed creek grading and appurtenances for stabilization, Soil Erosion/Sediment Control measures, and all necessary restoration.
AvailableMount Morris Central School
Press box, dug outs and sport courts.
Posted Date
-
Due Date
Dec 11, 2025
Release: -
Mount Morris Central School
Close: Dec 11, 2025
Press box, dug outs and sport courts.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis