Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
U.S. Army Engineer Research and Development Center (ERDC)
The Engineer Research and Development Center (ERDC) Environmental Laboratory is soliciting innovative natural and hybrid infrastructure (NHI) solutions for shoreline restoration and coastal resiliency at Naval Support Area (NSA) Cutler, Maine, emphasizing approaches tailored to cold northeastern coastal environments. This Commercial Solutions Opening seeks demonstration of innovative NHI technologies, evidence of prior NHI design and permitting experience, and expertise in cold-region environments, with deliverables including design concepts, permit applications, cost estimates, and a final report. Offerors must submit five-page solution briefs electronically through erdcwerx.org by 10:00 AM CST on 2026-01-09; total available funding is $2,100,000 with potential for up to three awards and up to a 30-month performance period.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
U.S. Army Engineer District Vicksburg
Provide naval support area (NSA) cutler shoreline restoration, coastal resiliency, and asset protection.
Posted Date
Dec 4, 2025
Due Date
Jan 9, 2026
Release: Dec 4, 2025
U.S. Army Engineer District Vicksburg
Close: Jan 9, 2026
Provide naval support area (NSA) cutler shoreline restoration, coastal resiliency, and asset protection.
AvailableMobile County
The salt aire shoreline restoration project consists of construction of shoreline protection and hydraulic dredging and placement for marsh creation. The shoreline protection includes optional excavation of flotation access channels, and the construction of graded rock riprap breakwaters. The marsh creation includes the construction of earthen containment dikes between the breakwater gaps, hydraulic dredging of an offshore borrow area, placement of dredged fill within the marsh creation areas, and excavation of tidal creeks.
Posted Date
Nov 12, 2025
Due Date
Jan 7, 2026
Release: Nov 12, 2025
Mobile County
Close: Jan 7, 2026
The salt aire shoreline restoration project consists of construction of shoreline protection and hydraulic dredging and placement for marsh creation. The shoreline protection includes optional excavation of flotation access channels, and the construction of graded rock riprap breakwaters. The marsh creation includes the construction of earthen containment dikes between the breakwater gaps, hydraulic dredging of an offshore borrow area, placement of dredged fill within the marsh creation areas, and excavation of tidal creeks.
Monroe County
Provide a living shoreline system to enhance resilience and protect the transfer station and provide environmental benefits. Mobilization and demobilization; maintenance of traffic (furnish and install); temporary staging area erosion and sediment control (furnish and install); floating turbidity barrier (furnish and install); soil tracking prevention device; 4,788 sf living shoreline creation and shoreline stabilization base material (furnish and install); 10,052 sf living shoreline plantings (furnish and install); 460 ea shoreline stabilization measures (furnish and install); construction surveys; rehabilitation of temporary staging area to original condition; 4,273 sf equivalent shoreline stabilization measures (furnish and install). See outside link.
Posted Date
Oct 23, 2025
Due Date
Jan 6, 2026
Release: Oct 23, 2025
Monroe County
Close: Jan 6, 2026
Provide a living shoreline system to enhance resilience and protect the transfer station and provide environmental benefits. Mobilization and demobilization; maintenance of traffic (furnish and install); temporary staging area erosion and sediment control (furnish and install); floating turbidity barrier (furnish and install); soil tracking prevention device; 4,788 sf living shoreline creation and shoreline stabilization base material (furnish and install); 10,052 sf living shoreline plantings (furnish and install); 460 ea shoreline stabilization measures (furnish and install); construction surveys; rehabilitation of temporary staging area to original condition; 4,273 sf equivalent shoreline stabilization measures (furnish and install). See outside link.
Sarasota County
Provide professional engineering services to provide all necessary coastal engineering for the management and maintenance of the county's managed manasota key beach restoration.
Posted Date
Dec 2, 2025
Due Date
Jan 13, 2026
Release: Dec 2, 2025
Sarasota County
Close: Jan 13, 2026
Provide professional engineering services to provide all necessary coastal engineering for the management and maintenance of the county's managed manasota key beach restoration.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis