Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Commonwealth of Virginia, through the Virginia Department of Transportation (VDOT), issued an Invitation for Bids (IFB) for bridge superstructure replacements along Route 605 in Wise County (Bristol District). The project requires contractor prequalification, electronic bid submission, and includes multiple work items such as pipe installation, check dams, excavations, aggregate and asphalt placement, and other structural tasks; work completion is scheduled by December 1, 2026. Bidders must submit questions via VDOT’s CABB and submit electronic bids (Bid Express/Bidx.com or the buyer site) by the stated deadline.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
(780-Ft) Bridge Superstructure (S.N. 016-0098) replacement including approach slab replacement, pier repairs, lighting, ADA improvements, traffic signal modernization, pedestrian walkways, bike lanes, curb ramp, and curb and gutter replacement. See outside link.
Posted Date
Nov 17, 2025
Due Date
Jan 16, 2026
Release: Nov 17, 2025
Close: Jan 16, 2026
(780-Ft) Bridge Superstructure (S.N. 016-0098) replacement including approach slab replacement, pier repairs, lighting, ADA improvements, traffic signal modernization, pedestrian walkways, bike lanes, curb ramp, and curb and gutter replacement. See outside link.
Available(780-Ft) Bridge Superstructure (S.N. 016-0098) replacement including approach slab replacement, pier repairs, lighting, ADA improvements, traffic signal modernization, pedestrian walkways, bike lanes, curb ramp, and curb and gutter replacement. See outside link.
Posted Date
Nov 17, 2025
Due Date
Jan 16, 2026
Release: Nov 17, 2025
Close: Jan 16, 2026
(780-Ft) Bridge Superstructure (S.N. 016-0098) replacement including approach slab replacement, pier repairs, lighting, ADA improvements, traffic signal modernization, pedestrian walkways, bike lanes, curb ramp, and curb and gutter replacement. See outside link.
AvailableWork includes: excavation, aggregate base material, asphalt concrete, 6" pipe underdrain, prestressed concrete slab, erosion control, waterproofing - epoxy resin type ep-3b/ep-3t, guardrail work, signs, flexible pavement planing, pavement marking.
Posted Date
Dec 9, 2025
Due Date
Jan 28, 2026
Release: Dec 9, 2025
Close: Jan 28, 2026
Work includes: excavation, aggregate base material, asphalt concrete, 6" pipe underdrain, prestressed concrete slab, erosion control, waterproofing - epoxy resin type ep-3b/ep-3t, guardrail work, signs, flexible pavement planing, pavement marking.
AvailableWork includes: excavation, aggregate base material, asphalt concrete, 6" pipe underdrain, prestressed concrete slab, erosion control, waterproofing - epoxy resin type ep-3b/ep-3t, guardrail work, signs, flexible pavement planing, pavement marking.
Posted Date
Dec 9, 2025
Due Date
Jan 28, 2026
Release: Dec 9, 2025
Close: Jan 28, 2026
Work includes: excavation, aggregate base material, asphalt concrete, 6" pipe underdrain, prestressed concrete slab, erosion control, waterproofing - epoxy resin type ep-3b/ep-3t, guardrail work, signs, flexible pavement planing, pavement marking.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis