Virginia Department of Transportation
13.300 Acre clearing and grubbing; 9,539 LF of 15" storm sewer pipe; 207 LF of 18" jacked and bored pipe; 307 LF pipe rehabilitation; 12,159 CY siltation control excavation; 23,183 CY storm water main basin excavation; 75,706 LF saw-cut asphalt conc full depth (I-81); 1,362 LF saw cutting; 334 LF of 8" DI sanitary sewer pipe; 37 LF of 4" sanitary service lateral connection. See attached file.
20251014023047OCT-N24
City of Olive Branch
The project consists of the construction of Craft Road Widening from College Road to Church Road in the City of Olive Branch MS.
Town of Avon
Road construction - HMA pavement construction, concrete pavement, sidewalk construction, shared-use path construction, storm sewer construction, driveway construction, and lighting construction.
City of Turlock
Work consists of 1,353 SF of remove asphalt, earthwork and grading, remove existing improvements, 877 LF of remove white stripe, 2 EA of remove sign, 1 EA of remove 1a traffic signal pole and signal heads, 1 EA of remove electrolier and base, 731 LF of minor concrete (curb and gutter), 5,763 sf of minor concrete (sidewalk and flatwork), 1 EA of pedestrian access ramp, 41 ton of hma paving patch, 738 ton of hma ac paving, 54,660 SF of crack treatment, 54,660 SF of slurry seal, 11 LF of street barricade, 3 EA of fire hydrant assemblies, 78 LF of 18" storm drain pipe, 2 EA of catch basin. See attached file.