Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 310 SY geotextile filter fabric beneath temporary cart path; 24 LF full depth concrete sawing (8" thick or less); 10 LF 12" dia. Storm drain pipe (sdp), including fabric wrap; 1 LS temporary erosion control; 1,500 SY hydroseeding; 4 EA 18" wide concrete collar for in-line point repair on existing storm drain pipe.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Release: Nov 2, 2025
Close: Dec 17, 2025
Drainage Improvements.
AvailablePremium
Access the largest public sector contact database
Work includes 17 EA of tree removal; 3,900 SY of grading; 1,100 TN of trench backfill; 16 SY of stone riprap, class a3; 16 SY of filter fabric; 263 of portland cement concrete roadway pavement; 40 TN of HMA roadway repair; 253 SF of portland cement concrete sidewalk 4"; 114 SY of aggregate driveway repair; 283 SY of pavement removal; 183 SY of driveway pavement removal; 253 SF of sidewalk removal; 15 EA of drainage structure to be removed; 125 SY of grading; 114 SF of sidewalk removal; 20 TN of HMA roadway repair; 114 SF of portland cement concrete sidewalk 4"; etc, see attached file.
Posted Date
-
Due Date
Dec 17, 2025
Close: Dec 17, 2025
Work includes 17 EA of tree removal; 3,900 SY of grading; 1,100 TN of trench backfill; 16 SY of stone riprap, class a3; 16 SY of filter fabric; 263 of portland cement concrete roadway pavement; 40 TN of HMA roadway repair; 253 SF of portland cement concrete sidewalk 4"; 114 SY of aggregate driveway repair; 283 SY of pavement removal; 183 SY of driveway pavement removal; 253 SF of sidewalk removal; 15 EA of drainage structure to be removed; 125 SY of grading; 114 SF of sidewalk removal; 20 TN of HMA roadway repair; 114 SF of portland cement concrete sidewalk 4"; etc, see attached file.
AvailableWork includes 17 EA of tree removal; 3,900 SY of grading; 1,100 TN of trench backfill; 16 SY of stone riprap, class a3; 16 SY of filter fabric; 263 of portland cement concrete roadway pavement; 40 TN of HMA roadway repair; 253 SF of portland cement concrete sidewalk 4"; 114 SY of aggregate driveway repair; 283 SY of pavement removal; 183 SY of driveway pavement removal; 253 SF of sidewalk removal; 15 EA of drainage structure to be removed; 125 SY of grading; 114 SF of sidewalk removal; 20 TN of HMA roadway repair; 114 SF of portland cement concrete sidewalk 4"; etc, see attached file.
Posted Date
-
Due Date
Dec 17, 2025
Close: Dec 17, 2025
Work includes 17 EA of tree removal; 3,900 SY of grading; 1,100 TN of trench backfill; 16 SY of stone riprap, class a3; 16 SY of filter fabric; 263 of portland cement concrete roadway pavement; 40 TN of HMA roadway repair; 253 SF of portland cement concrete sidewalk 4"; 114 SY of aggregate driveway repair; 283 SY of pavement removal; 183 SY of driveway pavement removal; 253 SF of sidewalk removal; 15 EA of drainage structure to be removed; 125 SY of grading; 114 SF of sidewalk removal; 20 TN of HMA roadway repair; 114 SF of portland cement concrete sidewalk 4"; etc, see attached file.
AvailableWork includes installing two stormwater pump stations, control houses, backup power, a motorized sluice gate, drainage structures/piping, drainage canal deepening/widening, water quality structures, an energy dissipation chamber, bulkhead replacement, elevated roadways, utility relocations/offsets, management of contaminated soil and groundwater, traffic control, site work, grading and restoration.
Posted Date
Oct 1, 2025
Due Date
Dec 18, 2025
Release: Oct 1, 2025
Close: Dec 18, 2025
Work includes installing two stormwater pump stations, control houses, backup power, a motorized sluice gate, drainage structures/piping, drainage canal deepening/widening, water quality structures, an energy dissipation chamber, bulkhead replacement, elevated roadways, utility relocations/offsets, management of contaminated soil and groundwater, traffic control, site work, grading and restoration.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis