Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of 100 LF, saweut pavement (All Types); 30 SY, sawcut pavement (All Types); 225 SY, remove concrete pavement/foundation; 20 LF, remove curb and gutter; 1,750 LF, remove fence (Chain Link, 3-6"); 2,250 LF, remove fence (Chain Link, 8-145). 0.5 AC, hydromulching; 0.5 AC, seeding (Low Maintenance Turf); 10 SY, concrete pavement (4", Sidewalk). See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide flood risk management project, reach 4 phase 1 river floodwall and pump station.
Posted Date
-
Due Date
Dec 16, 2025
Close: Dec 16, 2025
Provide flood risk management project, reach 4 phase 1 river floodwall and pump station.
AvailablePremium
Access the largest public sector contact database
The U.S. Army Corps of Engineers, Rock Island District is soliciting competitive bids for construction of flood risk management infrastructure in Cedar Rapids including site demolition, pavements, storm sewer systems, a cast-in-place concrete floodwall (with gate wells, geotechnical instrumentation, relief wells, trench and toe drains) and a pump station. This unrestricted Invitation for Bid (NAICS 237990) estimates the contract between $25,000,000 and $100,000,000, requires performance to start within 15 days of award and completion within 970 consecutive calendar days (Amendment 0001 updated completion days). A mandatory site visit was scheduled for 02 December 2025, questions are to be submitted via ProjNet, and the updated bid submission deadline is January 8, 2026 at 1:00 PM CST.
Posted Date
Nov 14, 2025
Due Date
Jan 8, 2026
Release: Nov 14, 2025
Close: Jan 8, 2026
The U.S. Army Corps of Engineers, Rock Island District is soliciting competitive bids for construction of flood risk management infrastructure in Cedar Rapids including site demolition, pavements, storm sewer systems, a cast-in-place concrete floodwall (with gate wells, geotechnical instrumentation, relief wells, trench and toe drains) and a pump station. This unrestricted Invitation for Bid (NAICS 237990) estimates the contract between $25,000,000 and $100,000,000, requires performance to start within 15 days of award and completion within 970 consecutive calendar days (Amendment 0001 updated completion days). A mandatory site visit was scheduled for 02 December 2025, questions are to be submitted via ProjNet, and the updated bid submission deadline is January 8, 2026 at 1:00 PM CST.
AvailableWork includes clearing and grubbing, vibration monitoring, demolish existing facilities, relocate mailbox, remove and replace ace and vine sign, remove and replace pet hospital sign, closure structure #1, #2, #3, inspection trench excavation and backfill, excavation, earthen backfill (f), floodwall - concrete t-wall footing (f), floodwall -concrete t-wall (f), floodwall - sheet pile wall (f), chain link fence (6 foot, 3 strand barbed wire, vinyl slats), wood and wire divider fence (6-ft), 3-ft pedestrian safety railing, 4-ft pedestrian safety railing, o&m chain link fence gate, wall street waterline modifications, wall street sewerline modifications, lincoln avenue waterline modifications.
Posted Date
Sep 30, 2025
Due Date
Jan 9, 2026
Release: Sep 30, 2025
Close: Jan 9, 2026
Work includes clearing and grubbing, vibration monitoring, demolish existing facilities, relocate mailbox, remove and replace ace and vine sign, remove and replace pet hospital sign, closure structure #1, #2, #3, inspection trench excavation and backfill, excavation, earthen backfill (f), floodwall - concrete t-wall footing (f), floodwall -concrete t-wall (f), floodwall - sheet pile wall (f), chain link fence (6 foot, 3 strand barbed wire, vinyl slats), wood and wire divider fence (6-ft), 3-ft pedestrian safety railing, 4-ft pedestrian safety railing, o&m chain link fence gate, wall street waterline modifications, wall street sewerline modifications, lincoln avenue waterline modifications.
AvailableWork consists of grading, storm drain installation, drainage structures, roadway improvements, including ada accessible drive pads, wheelchair ramps, storm drainage, waterline replacement and miscellaneous construction as needed.
Posted Date
Dec 1, 2025
Due Date
Dec 18, 2025
Release: Dec 1, 2025
Close: Dec 18, 2025
Work consists of grading, storm drain installation, drainage structures, roadway improvements, including ada accessible drive pads, wheelchair ramps, storm drainage, waterline replacement and miscellaneous construction as needed.