Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Southern Cayuga Lake Intermunicipal Water Commission
The Motor Control Center Pre Purchase Equipment consists primarily of: 1. A new 1,600A, 480Y/277V Motor Control Center as Manufactured by ABB. 2. Feeder Breakers and Starters as Follows: a. Soft Starter “M1” – 150HP, 3P, 480V with Line Side Breaker; b. Soft Starter “M2” – 250HP, 3P, 480V with Line Side Breaker; c. Soft Starter “M3” – 250HP, 3P, 480V with Line Side Breaker; d. VFD “M4” – 250HP, 3P, 480V with Line Side Breaker; e. Feeder Breaker “RV-1/RV-2” – 20A, 3P, 480V; f. Branch Circuit Breaker “EUH-1” – 30A, 3P, 480V; g. Branch Circuit Breaker “EUH-2” – 30A, 3P, 480V; h. Feeder Breaker “TR-1” – 30A, 3P, 480V; i. Spare Breaker – 600A, 3P, 480V. 3. Soft Starters shall be as Manufactured by WEG. 4. Storage.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
City of Lincoln
Pump station motor control center project.
Posted Date
Nov 12, 2025
Due Date
Dec 12, 2025
Release: Nov 12, 2025
City of Lincoln
Close: Dec 12, 2025
Pump station motor control center project.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Union Sanitary District
The project consists of Electrical power modification and replacement at Alvardo wastewater treatment plant. Replacement of existing 480V swithboard no 3. Replacement of 480V motor control center no 25. Re-feed of 480V power from SWBD-3
Posted Date
Nov 25, 2025
Due Date
Jan 15, 2026
Release: Nov 25, 2025
Union Sanitary District
Close: Jan 15, 2026
The project consists of Electrical power modification and replacement at Alvardo wastewater treatment plant. Replacement of existing 480V swithboard no 3. Replacement of 480V motor control center no 25. Re-feed of 480V power from SWBD-3
AvailableUnion Sanitary District
Project includes of electrical power modification and replacement, replacement of existing 480V Switchboard No. 3 (SWBD-3), replacement of existing 480V Motor Control Center No. 25 (MCC-25), re-feed of 480V power from SWBD-3 to MCC No. 30 (MCC-30).
Posted Date
Jan 24, 2022
Due Date
Jan 15, 2026
Release: Jan 24, 2022
Union Sanitary District
Close: Jan 15, 2026
Project includes of electrical power modification and replacement, replacement of existing 480V Switchboard No. 3 (SWBD-3), replacement of existing 480V Motor Control Center No. 25 (MCC-25), re-feed of 480V power from SWBD-3 to MCC No. 30 (MCC-30).
AvailableSouthern Cayuga Lake Intermunicipal Water Commission
The Switchboards 600 Volts and Under Pre Purchase Equipment consists primarily of: 1. A new 1,600A, 480Y/277V Main Circuit Breaker as Manufactured by ABB.
Posted Date
Nov 24, 2025
Due Date
Dec 19, 2025
Release: Nov 24, 2025
Southern Cayuga Lake Intermunicipal Water Commission
Close: Dec 19, 2025
The Switchboards 600 Volts and Under Pre Purchase Equipment consists primarily of: 1. A new 1,600A, 480Y/277V Main Circuit Breaker as Manufactured by ABB.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →