Retrieving RFP details
Release
Close
Lower Platte South Natural Resources District
This project shall include removing and disposing of all existing deck boards, railroad tie joists, and bridge railings. All bridge stringers are to be inspected for rot. Rotted stringers shall be disposed of and replaced as needed. New railroad tie joists, deck boards, and railing shall be installed. Deck boards shall be installed at a 45-degree angle across joists. Any damage to the trail or shoulder from construction shall be repaired.
Lower Platte South Natural Resources District
Grade and dispose of loose rock ballast. Placement of crushed limestone screenings atop the existing crushed limestone trail. Other work on the project is to remove and reinstall metal transitions on east bridge, and remove and reinstall bollards.
City of Alpharetta
Design-Build teams for Request for Proposals 26-107 for Alpha Loop Trail Design-Build from Haynes Bridge Rd to Encore Pkwy. This project is for the design and construction of a 12-foot wide lighted shared-use path connecting Haynes Bridge Road to Encore Parkway, approx. 1.2 miles.
Harris County Municipal Utility District 70
Construction of the stargazing trail bridge.
Release
Oct 14, 2025
Close
Nov 03, 2025