Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Middleton
Project consists of the replacement of a weil series 5300 variable speed water pressure booster pump.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Folsom
Provide condition assessment for the water treatment plant and water booster pump station facilities.
Posted Date
Nov 3, 2025
Due Date
Dec 19, 2025
Release: Nov 3, 2025
City of Folsom
Close: Dec 19, 2025
Provide condition assessment for the water treatment plant and water booster pump station facilities.
AvailableLauderdale County
The Project consists of a new elevated water tower, booster pump station and associated water main piping.
Posted Date
Oct 21, 2025
Due Date
Nov 18, 2025
Release: Oct 21, 2025
Lauderdale County
Close: Nov 18, 2025
The Project consists of a new elevated water tower, booster pump station and associated water main piping.
Wayne Community College
Work includes the addition of a master meter, master back flow preventer, and packaged domestic and fire booster pump system and shelter. This addition also includes an extension of approx 250 LF of water main off of wayne community college entrance drive, an addition of nine, 10" isolation valves, installation of a bypass check valve and vault, connection of the packaged booster system to existing power, site/pavement repairs, implementation of required erosion and sediment control measures, installation and maintenance of traffic control, and the connection to existing private water main.
Posted Date
Nov 11, 2025
Due Date
Dec 8, 2025
Release: Nov 11, 2025
Wayne Community College
Close: Dec 8, 2025
Work includes the addition of a master meter, master back flow preventer, and packaged domestic and fire booster pump system and shelter. This addition also includes an extension of approx 250 LF of water main off of wayne community college entrance drive, an addition of nine, 10" isolation valves, installation of a bypass check valve and vault, connection of the packaged booster system to existing power, site/pavement repairs, implementation of required erosion and sediment control measures, installation and maintenance of traffic control, and the connection to existing private water main.
AvailableCape Fear Public Utility Authority
Work consist of booster pump station and waterline interconnect, 16" water transmission main, installed water main crossing, existing 16" water main, existing 12" water main, elevated tank more.
Posted Date
-
Due Date
Nov 18, 2025
Cape Fear Public Utility Authority
Close: Nov 18, 2025
Work consist of booster pump station and waterline interconnect, 16" water transmission main, installed water main crossing, existing 16" water main, existing 12" water main, elevated tank more.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis