Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Miami Beach
Seeks to enhance transportation alternatives and safety in the vicinity of Miami Beach Senior High School (MBSHS).
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
City of Miami Beach
The City of Miami Beach is soliciting bids for pedestrian enhancements near Miami Beach Senior High School. The solicitation is posted on the City’s BidNet Direct portal and closes on January 5, 2026 at 3:00 PM EST.
Posted Date
Nov 18, 2025
Due Date
Jan 5, 2026
Release: Nov 18, 2025
City of Miami Beach
Close: Jan 5, 2026
The City of Miami Beach is soliciting bids for pedestrian enhancements near Miami Beach Senior High School. The solicitation is posted on the City’s BidNet Direct portal and closes on January 5, 2026 at 3:00 PM EST.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Aurora
Pedestrian Bridge. In addition, a series of wayfinding and interpretive signs will be installed.
Posted Date
Nov 12, 2025
Due Date
Jan 5, 2026
Release: Nov 12, 2025
City of Aurora
Close: Jan 5, 2026
Pedestrian Bridge. In addition, a series of wayfinding and interpretive signs will be installed.
AvailableCity of Long Beach
Work includes traffic control: pedestrian and vehicular traffic control; Demolition and Removal: demolition and removal of existing pedestrian concrete paving and brick pavers, curb ramp, portion of existing driveway, apron and curb, concrete curbs at planting areas, and landscape elements; Surface and Structural Improvements: Improvements to be constructed include new Americans with Disabilities (ADA) curb ramp, portion of vehicular driveways, aprons, and curbs, enhanced integral color concrete paving, decorative embedded metal inlays with antislip coating (bid alternate), pedestrian concrete paving, raised truncated domes at signalized vehicular crossings, disintegrated granite (D.G.) at existing tree wells, decorative epoxy modified acrylic coating on existing crosswalk concrete paving; Site Furnishing and Architectural Elements: site furnishings, irrigation, landscape planting, refinishing select existing vehicular light poles and mast poles with new paint and existing bench seating (bid alternate), and all associated site development. Preservation of Exiting Features: Some elements on site, including but not limited to, concrete paving, pedestrian lighting, palm trees/trees, utilities, and other associated items shall be protected in place.
Posted Date
Oct 30, 2025
Due Date
Dec 18, 2025
Release: Oct 30, 2025
City of Long Beach
Close: Dec 18, 2025
Work includes traffic control: pedestrian and vehicular traffic control; Demolition and Removal: demolition and removal of existing pedestrian concrete paving and brick pavers, curb ramp, portion of existing driveway, apron and curb, concrete curbs at planting areas, and landscape elements; Surface and Structural Improvements: Improvements to be constructed include new Americans with Disabilities (ADA) curb ramp, portion of vehicular driveways, aprons, and curbs, enhanced integral color concrete paving, decorative embedded metal inlays with antislip coating (bid alternate), pedestrian concrete paving, raised truncated domes at signalized vehicular crossings, disintegrated granite (D.G.) at existing tree wells, decorative epoxy modified acrylic coating on existing crosswalk concrete paving; Site Furnishing and Architectural Elements: site furnishings, irrigation, landscape planting, refinishing select existing vehicular light poles and mast poles with new paint and existing bench seating (bid alternate), and all associated site development. Preservation of Exiting Features: Some elements on site, including but not limited to, concrete paving, pedestrian lighting, palm trees/trees, utilities, and other associated items shall be protected in place.
AvailableBaldwin County
Procurement for constructing a raised pedestrian crosswalk on County Road 68.
Posted Date
-
Due Date
Dec 30, 2025
Baldwin County
Close: Dec 30, 2025
Procurement for constructing a raised pedestrian crosswalk on County Road 68.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →