Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Valparaiso
The project includes the replacement/relocation of approx. 220 LF of 10" force main.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Porter County
Force main relocation. The work included shall be the installation of new 6" HDPE force main by horizontal directional boring installation with angled fittings and thrust blocks and anchors. Installation of the new force main will require removal and replacement of a light pole and electrical box, a 12" PVC culvert, asphalt, and the subgrade preparation requisite with such items. The new force main shall be connected to the old force main and the disconnected section of old force main shall be drained, filled with grout, and capped for abandonment. The project will also include demolition and removal of the existing structure, and installation of the proposed structure.
Posted Date
Nov 19, 2025
Due Date
Dec 9, 2025
Release: Nov 19, 2025
Porter County
Close: Dec 9, 2025
Force main relocation. The work included shall be the installation of new 6" HDPE force main by horizontal directional boring installation with angled fittings and thrust blocks and anchors. Installation of the new force main will require removal and replacement of a light pole and electrical box, a 12" PVC culvert, asphalt, and the subgrade preparation requisite with such items. The new force main shall be connected to the old force main and the disconnected section of old force main shall be drained, filled with grout, and capped for abandonment. The project will also include demolition and removal of the existing structure, and installation of the proposed structure.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
London Utility Commission
Installation of approx. 7,600 LF of 12" PVC force main, 500 LF of 12" HDPE force main, three (3) air release valves, and other associated appurtenances.
Posted Date
-
Due Date
Nov 25, 2025
Release: -
London Utility Commission
Close: Nov 25, 2025
Installation of approx. 7,600 LF of 12" PVC force main, 500 LF of 12" HDPE force main, three (3) air release valves, and other associated appurtenances.
New Orleans Sewerage and Water Board
Sewer force main replacement project.
Posted Date
Nov 5, 2025
Due Date
Dec 12, 2025
Release: Nov 5, 2025
New Orleans Sewerage and Water Board
Close: Dec 12, 2025
Sewer force main replacement project.
AvailableOnslow Water And Sewer Authority
Work includes approx 300 LF of existing 8" effluent force main. See attached file.
Posted Date
Nov 6, 2025
Due Date
Dec 4, 2025
Release: Nov 6, 2025
Onslow Water And Sewer Authority
Close: Dec 4, 2025
Work includes approx 300 LF of existing 8" effluent force main. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →