Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Mechanical replacements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The project entails the complete removal and replacement of the roof. Work shall include all architectural; principal features of the project include bulk ACM abatement; demolition of all existing roofing materials; and replacements with new components, as well as the removal and reinstallation of existing roof mechanical equipment as included within contract documents.
Posted Date
Nov 14, 2025
Due Date
Jan 14, 2026
Release: Nov 14, 2025
Close: Jan 14, 2026
The project entails the complete removal and replacement of the roof. Work shall include all architectural; principal features of the project include bulk ACM abatement; demolition of all existing roofing materials; and replacements with new components, as well as the removal and reinstallation of existing roof mechanical equipment as included within contract documents.
Premium
Access the largest public sector contact database
Seeking Mechanical Contractor Services for Building D MAU Replacement on the Campus. Work includes the replacement of (1) air handler and the addition of controls to the building relief and outside air intake system. Contractor shall render services for the air conditioning, outside air ventilation, controls, power distribution, and hydronic piping related to: Building D - Makeup Air Unit (MAU) Replacement.
Posted Date
Dec 11, 2025
Due Date
Jan 21, 2026
Release: Dec 11, 2025
Close: Jan 21, 2026
Seeking Mechanical Contractor Services for Building D MAU Replacement on the Campus. Work includes the replacement of (1) air handler and the addition of controls to the building relief and outside air intake system. Contractor shall render services for the air conditioning, outside air ventilation, controls, power distribution, and hydronic piping related to: Building D - Makeup Air Unit (MAU) Replacement.
AvailableDoor replacements.
Posted Date
Dec 9, 2025
Due Date
Jan 6, 2026
Release: Dec 9, 2025
Close: Jan 6, 2026
Door replacements.
AvailableThe City of Winston, Oregon is soliciting bids for construction of an inverted sanitary sewer siphon project with associated structures and improvements, with plans/specifications distributed via QuestCDN. Bids are due January 15, 2026 at 2:00 PM (PT).
Posted Date
-
Due Date
Jan 15, 2026
Close: Jan 15, 2026
The City of Winston, Oregon is soliciting bids for construction of an inverted sanitary sewer siphon project with associated structures and improvements, with plans/specifications distributed via QuestCDN. Bids are due January 15, 2026 at 2:00 PM (PT).
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis