Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project for the following categories of work: general building construction; masonry; miscellaneous and ornamental iron; waterproofing, damp-proofing and caulking; roofing and flashing; tile; acoustical tile; resilient floors; painting; elevators; fire protection; plumbing; heating, ventilation & air-conditioning; electrical
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The owner seeks a collaborative design build firm for the purposes of renovation of the pedestrian bridge. Restore the bridge to full functionality, noting DSA confirmed a full structural retrofit would not be required. Maintain consistent specs and finishes; avoid elevators and chair lifts, reducing mechanical/electrical scope as much as possible; reduce future maintenance requirements; tie into the existing campus and limit impact to the site; meet all DSA requirements, including ADA codes; provide an efficient design-build process which meets an established design and construction budget.
Posted Date
Oct 31, 2025
Due Date
Dec 12, 2025
Release: Oct 31, 2025
Close: Dec 12, 2025
The owner seeks a collaborative design build firm for the purposes of renovation of the pedestrian bridge. Restore the bridge to full functionality, noting DSA confirmed a full structural retrofit would not be required. Maintain consistent specs and finishes; avoid elevators and chair lifts, reducing mechanical/electrical scope as much as possible; reduce future maintenance requirements; tie into the existing campus and limit impact to the site; meet all DSA requirements, including ADA codes; provide an efficient design-build process which meets an established design and construction budget.
Statement of qualifications should have prior construction management at risk experience related to the size and scope and experience including phased addition/ renovation or phased new construction of school building.
Posted Date
Nov 20, 2025
Due Date
Dec 19, 2025
Release: Nov 20, 2025
Close: Dec 19, 2025
Statement of qualifications should have prior construction management at risk experience related to the size and scope and experience including phased addition/ renovation or phased new construction of school building.
AvailableStatement of qualifications should have prior construction management at risk experience related to the size and scope and experience including phased addition/ renovation or phased new construction of school building.
Posted Date
Nov 20, 2025
Due Date
Dec 19, 2025
Release: Nov 20, 2025
Close: Dec 19, 2025
Statement of qualifications should have prior construction management at risk experience related to the size and scope and experience including phased addition/ renovation or phased new construction of school building.
AvailableThe project includes but is not limited to renovation of the existing fire station and construction of a new addition. Work will involve site improvements, new utility connections, and removal and replacement of paving. Renovation scope includes interior and exterior updates to convert the existing building into administrative & training spaces. The new addition will provide a fire apparatus garage along with a connector linking it to the existing structure.
Posted Date
Dec 11, 2025
Due Date
Jan 15, 2026
Release: Dec 11, 2025
Close: Jan 15, 2026
The project includes but is not limited to renovation of the existing fire station and construction of a new addition. Work will involve site improvements, new utility connections, and removal and replacement of paving. Renovation scope includes interior and exterior updates to convert the existing building into administrative & training spaces. The new addition will provide a fire apparatus garage along with a connector linking it to the existing structure.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis