Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approx 5,573 LF 8" CIPP sanitary rehabilitation by water/steam or air pressure; 4,380 LF heavy cleaning and televising to locate taps; 41 VF manhole lining. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work consist of approx 250 FT 6" sanitary rehab with CIPP; 5,701 FT 8" sanitary rehab with CIPP; 640 FT 10" sanitary rehab with CIPP; 177 FT 20"/21" sanitary; 4,002 FT 24" sanitary rehab with CIPP; 20,027 FT heavy cleaning & televising to locate taps on sewers 24" diameter and smaller; 160 EA testing lateral connections at 8" to 10" pipe; 27,094 FT post cons tv inspection of rehabilitated sewers; 232 FT 8" sanitary sewer with type B backfill; connect to existing sanitary service lateral. See outside link for more.
Posted Date
-
Due Date
Dec 18, 2025
Close: Dec 18, 2025
Work consist of approx 250 FT 6" sanitary rehab with CIPP; 5,701 FT 8" sanitary rehab with CIPP; 640 FT 10" sanitary rehab with CIPP; 177 FT 20"/21" sanitary; 4,002 FT 24" sanitary rehab with CIPP; 20,027 FT heavy cleaning & televising to locate taps on sewers 24" diameter and smaller; 160 EA testing lateral connections at 8" to 10" pipe; 27,094 FT post cons tv inspection of rehabilitated sewers; 232 FT 8" sanitary sewer with type B backfill; connect to existing sanitary service lateral. See outside link for more.
Premium
Access the largest public sector contact database
Project generally includes, but is not limited to cured-in-place pipe lining of approx. 3,700 LF of 8" sanitary sewer main, 53 lateral reinstatements, the rehabilitation of 6 sanitary sewer manholes, Alternate No. 1 which includes the cured-in-place pipe lining of approx. 1,350 LF of 8" sanitary sewer main, 20 lateral reinstatements, and associated work, and Alternate No. 2 which includes the manhole rehabilitation of 10 sanitary sewer manholes, and all associated materials, equipment, labor, and necessary apparatuses as contemplated by the Contract Documents.
Posted Date
Nov 6, 2025
Due Date
Dec 18, 2025
Release: Nov 6, 2025
Close: Dec 18, 2025
Project generally includes, but is not limited to cured-in-place pipe lining of approx. 3,700 LF of 8" sanitary sewer main, 53 lateral reinstatements, the rehabilitation of 6 sanitary sewer manholes, Alternate No. 1 which includes the cured-in-place pipe lining of approx. 1,350 LF of 8" sanitary sewer main, 20 lateral reinstatements, and associated work, and Alternate No. 2 which includes the manhole rehabilitation of 10 sanitary sewer manholes, and all associated materials, equipment, labor, and necessary apparatuses as contemplated by the Contract Documents.
AvailableWork generally includes filling and abandoning the existing 8” sanitary sewer and manholes, and installing approx. 3,500 LF of new 8" sanitary sewers, manholes, and additional 6" sanitary services includes driveway removal and patching, pavement patching, curb and gutter removal and replacement, inlet protection, temporary pavement patching, traffic control and protection, and landscape restoration. In addition, the scope includes construction of a new lift station along with associated electrical and civil work.
Posted Date
Nov 17, 2025
Due Date
Dec 19, 2025
Release: Nov 17, 2025
Close: Dec 19, 2025
Work generally includes filling and abandoning the existing 8” sanitary sewer and manholes, and installing approx. 3,500 LF of new 8" sanitary sewers, manholes, and additional 6" sanitary services includes driveway removal and patching, pavement patching, curb and gutter removal and replacement, inlet protection, temporary pavement patching, traffic control and protection, and landscape restoration. In addition, the scope includes construction of a new lift station along with associated electrical and civil work.
AvailableWork generally includes filling and abandoning the existing 8” sanitary sewer and manholes, and installing approx. 3,500 LF of new 8" sanitary sewers, manholes, and additional 6" sanitary services includes driveway removal and patching, pavement patching, curb and gutter removal and replacement, inlet protection, temporary pavement patching, traffic control and protection, and landscape restoration. In addition, the scope includes construction of a new lift station along with associated electrical and civil work.
Posted Date
Nov 17, 2025
Due Date
Dec 19, 2025
Release: Nov 17, 2025
Close: Dec 19, 2025
Work generally includes filling and abandoning the existing 8” sanitary sewer and manholes, and installing approx. 3,500 LF of new 8" sanitary sewers, manholes, and additional 6" sanitary services includes driveway removal and patching, pavement patching, curb and gutter removal and replacement, inlet protection, temporary pavement patching, traffic control and protection, and landscape restoration. In addition, the scope includes construction of a new lift station along with associated electrical and civil work.