Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This RFP is for the procurement of materials for the Main Street Waterline Replacement project, including PVC pipe, various gate valves, reducers, tees, bends, caps, sleeves, fire hydrant assemblies, valve boxes, glands, and flange bolt and gasket sets.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
This solicitation seeks materials for the Main St. Waterline Replacement project (Jackson St to Washington) including piping, fittings, valves and related waterline components. The contract is a materials purchase agreement where the selected vendor supplies all specified materials, which will be paid for based on actual quantities delivered and acceptance inspections. The posting is a procurement (not a grant) issued by Broken Arrow, OK and references solicitation documents hosted on QuestCDN (the posting is password-protected).
Posted Date
Dec 11, 2025
Due Date
Jan 6, 2026
Release: Dec 11, 2025
Close: Jan 6, 2026
This solicitation seeks materials for the Main St. Waterline Replacement project (Jackson St to Washington) including piping, fittings, valves and related waterline components. The contract is a materials purchase agreement where the selected vendor supplies all specified materials, which will be paid for based on actual quantities delivered and acceptance inspections. The posting is a procurement (not a grant) issued by Broken Arrow, OK and references solicitation documents hosted on QuestCDN (the posting is password-protected).
AvailableThis solicitation seeks materials for the Main St. Waterline Replacement project (Jackson St to Washington) including piping, fittings, valves and related waterline components. The contract is a materials purchase agreement where the selected vendor supplies all specified materials, which will be paid for based on actual quantities delivered and acceptance inspections. The posting is a procurement (not a grant) issued by Broken Arrow, OK and references solicitation documents hosted on QuestCDN (the posting is password-protected).
Posted Date
Dec 11, 2025
Due Date
Jan 6, 2026
Release: Dec 11, 2025
Close: Jan 6, 2026
This solicitation seeks materials for the Main St. Waterline Replacement project (Jackson St to Washington) including piping, fittings, valves and related waterline components. The contract is a materials purchase agreement where the selected vendor supplies all specified materials, which will be paid for based on actual quantities delivered and acceptance inspections. The posting is a procurement (not a grant) issued by Broken Arrow, OK and references solicitation documents hosted on QuestCDN (the posting is password-protected).
AvailableWork includes approx 1 LS clearing and grubbing; 122 CY asphalt concrete surface course; 30 LF of 6" sanitary sewer lateral; 1,585 LF of AWWA C909 PVCO 8" water main polyvinyl chloride pipe and fittings; 11 EA 1" copper service branch (long), open cut or pushed, drilled, or bored. See attached file.
Posted Date
Dec 5, 2025
Due Date
Dec 19, 2025
Release: Dec 5, 2025
Close: Dec 19, 2025
Work includes approx 1 LS clearing and grubbing; 122 CY asphalt concrete surface course; 30 LF of 6" sanitary sewer lateral; 1,585 LF of AWWA C909 PVCO 8" water main polyvinyl chloride pipe and fittings; 11 EA 1" copper service branch (long), open cut or pushed, drilled, or bored. See attached file.
Work consists of the replacement of approx 1,130 LF of 6" cast iron waterline with 8-inch ductile iron pipe from Weber Avenue NE west along 9th Street NE then through an off-road easement to Woodside Avenue NE. Approx 815 LF of 9th Street NE will then be reconstructed from Weber west to the cul-de-sac including new 304 aggregate, full depth asphalt pavement, concrete driveway aprons, and concrete curb and gutter.
Posted Date
Dec 4, 2025
Due Date
Dec 19, 2025
Release: Dec 4, 2025
Close: Dec 19, 2025
Work consists of the replacement of approx 1,130 LF of 6" cast iron waterline with 8-inch ductile iron pipe from Weber Avenue NE west along 9th Street NE then through an off-road easement to Woodside Avenue NE. Approx 815 LF of 9th Street NE will then be reconstructed from Weber west to the cul-de-sac including new 304 aggregate, full depth asphalt pavement, concrete driveway aprons, and concrete curb and gutter.