Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Virginia Department of Transportation
Work includes 1 LS of clearing and grubbing; 2,846 LF of pipe clean existing pipe; 12 EA of drainage clean existing inlet; 4,105 CY of regular excavation; 23 CY of siltation control excavation; 100 LF of 4" bored conduit; see attached file.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Virginia Department of Transportation
Work includes 1 LS of clearing and grubbing; 57 LF of 12" concrete pipe; 73 LF of 23" x 14" elliptical concrete pipe; 232 CY of regualar excavation; see attached file.
Posted Date
Nov 12, 2025
Due Date
Dec 17, 2025
Release: Nov 12, 2025
Virginia Department of Transportation
Close: Dec 17, 2025
Work includes 1 LS of clearing and grubbing; 57 LF of 12" concrete pipe; 73 LF of 23" x 14" elliptical concrete pipe; 232 CY of regualar excavation; see attached file.
AvailableCity of Spokane
Construct approx 10,000 LF of HMA shared use path (12,000 SY of 3" thick HMA and 4" thick CSTC), 2,700 cy of excavation and embankment, 200 LF of storm sewer, four drainage structures one 20' long contractor-designed buried structure, 350 LF of absorption trench, 400 LF of gravity block wall (2.5'-4.0' tall), one pedestrian hybrid beacon system, 100 LF of sidewalk, 400 LF of cement concrete curb, and sundry utility adjustments.
Posted Date
Oct 31, 2025
Due Date
Nov 24, 2025
Release: Oct 31, 2025
City of Spokane
Close: Nov 24, 2025
Construct approx 10,000 LF of HMA shared use path (12,000 SY of 3" thick HMA and 4" thick CSTC), 2,700 cy of excavation and embankment, 200 LF of storm sewer, four drainage structures one 20' long contractor-designed buried structure, 350 LF of absorption trench, 400 LF of gravity block wall (2.5'-4.0' tall), one pedestrian hybrid beacon system, 100 LF of sidewalk, 400 LF of cement concrete curb, and sundry utility adjustments.
AvailableCity of Sierra Vista
Work consists of construct a 10-foot-wide asphaltic concrete shared use path along the east side. The asphalt path is approx 5,290 ft long and connects to fry boulevard through an existing landscape. Work also includes, 985 CY of excavation (cumulative cut volume) earthwork; 5,000 SY of 4" aggregate base course; 5,000 CY of 2" asphalt concrete pavement; 4,000 sf of rip rap - hand placed grouted - one foot thick with toe down footings; 370 LF of 12-inch white stripe for crosswalk. See outside link.
Posted Date
Oct 22, 2025
Due Date
Nov 21, 2025
Release: Oct 22, 2025
City of Sierra Vista
Close: Nov 21, 2025
Work consists of construct a 10-foot-wide asphaltic concrete shared use path along the east side. The asphalt path is approx 5,290 ft long and connects to fry boulevard through an existing landscape. Work also includes, 985 CY of excavation (cumulative cut volume) earthwork; 5,000 SY of 4" aggregate base course; 5,000 CY of 2" asphalt concrete pavement; 4,000 sf of rip rap - hand placed grouted - one foot thick with toe down footings; 370 LF of 12-inch white stripe for crosswalk. See outside link.
AvailableVirginia Department of Transportation
Work includes 1 LS of clearing and grubbing; 28.200 TN of bedding material aggregate no. 25 or 26; 209 LF of 18" concrete pipe; 767 LF of 18" storm sewer pipe; 113 gal. of tack coat; 26 LF of 3/4" water service line; 429 LF of 6" DI water main; 76 LF of 18" steel encasement pipe 20" steel encasement pipe; see attached file.
Posted Date
Nov 12, 2025
Due Date
Dec 17, 2025
Release: Nov 12, 2025
Virginia Department of Transportation
Close: Dec 17, 2025
Work includes 1 LS of clearing and grubbing; 28.200 TN of bedding material aggregate no. 25 or 26; 209 LF of 18" concrete pipe; 767 LF of 18" storm sewer pipe; 113 gal. of tack coat; 26 LF of 3/4" water service line; 429 LF of 6" DI water main; 76 LF of 18" steel encasement pipe 20" steel encasement pipe; see attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis