Retrieving RFP details
Release
Close
City of Sierra Vista
Work consists of construct a 10-foot-wide asphaltic concrete shared use path along the east side. The asphalt path is approx 5,290 ft long and connects to fry boulevard through an existing landscape. Work also includes, 985 CY of excavation (cumulative cut volume) earthwork; 5,000 SY of 4" aggregate base course; 5,000 CY of 2" asphalt concrete pavement; 4,000 sf of rip rap - hand placed grouted - one foot thick with toe down footings; 370 LF of 12-inch white stripe for crosswalk. See outside link.
Michigan Department of Technology, Management and Budget
0.40 mi of hot mix asphalt shared-use path and boardwalk.
Michigan Department of Technology, Management and Budget
Provide 0.93 mi of hot mix asphalt shared-use path including tree removal, culvert removal and replacement, storm sewer and landscaping that also includes 1 EA tree, rem, 19 inch to 36 inch; 2 EA culv, rem, less than 24 inch; 10,522 LF erosion control, silt fence; 8 EA culv end sect, conc, 12 inch; 91 LF sewer, conc, 12 inch, tr det b, modified; 1 EA dr structure cover, type q; 1 EA combined sewer manhole, cover, adj, case 2, modified. See attached file.
Michigan Department of Technology, Management and Budget
1. 80 mi of hot mix asphalt shared-use path and pedestrian signal work.
Release
Oct 22, 2025
Close
Nov 21, 2025