City of Dania Beach
Work includes lift station no 6 mitigation. Bypass pumping 1 ls, removal and salvage/disposal of existing lift station equipment and materials 1 ls, demolition of existing submersible lift station 1 ls, install submersible lift station with valve vault 1 ls, install flow meter vault assembly 1 ls, install 6", dip force main with fittings, open cut 10 lf, install 8", dip force main with fittings, open cut 35 lf, install 8" plug valves 1 ea, install force main air release valve 1 ea, install 18", pvc gravity sewer 10 lf, install 1-inch hdpe water service with rpz and hose bib 1 ls, install/modify electrical service 1 ls, install control panel system and electrical lift station components 1 ls, install emergency generator system 1 ls. See outside link.
Lift_Station_No
_6_Mitigation
City of Dania Beach
Work includes lift station 4 mitigation. Demolition of the existing submersible lift station and associated components; Removal, salvage, abandonment, or dismantling of existing piping and equipment; Cleaning and return of all submersible pumps, control panels, and generator systems to the City. Construction and installation of a new submersible lift station, including a valve vault; Installation of a macerator assembly and flow meter vault; Installation of new force mains and gravity sewer lines (ductile iron and PVC); Installation of new 1-inch HDPE water service with RPZ and hose bib; Installation of a new control panel system, electrical service, and emergency generator system.
City of Mantorville
Lift station construction with gravity sewer and connection to existing forcemain. 1,000' sanitary sewer; 530' sanitary sewer by hdd; 6 sanitary manholes; 1 lift station, valve vault and piping.
Northwest Harris County Mud 5
Provide lift station no. 5, 6, and 11 generator additions. Scope of project to include but not limited to: three (3) natural gas generator additions including foundations, sound attenuating enclosures, load banks, duct banks, ATS, existing pavement saw cut and disposal, and all necessary electrical components and all appurtenances for a complete emergency natural gas generator electrical power system addition for the three (3) different existing lift stations, in accordance with plans and specifications. Site restoration. All work shall be complete in place.
Release
Oct 14, 2025
Close
Nov 14, 2025