Retrieving RFP details
Release
Close
City of Dania Beach
Work includes lift station 4 mitigation. Demolition of the existing submersible lift station and associated components; Removal, salvage, abandonment, or dismantling of existing piping and equipment; Cleaning and return of all submersible pumps, control panels, and generator systems to the City. Construction and installation of a new submersible lift station, including a valve vault; Installation of a macerator assembly and flow meter vault; Installation of new force mains and gravity sewer lines (ductile iron and PVC); Installation of new 1-inch HDPE water service with RPZ and hose bib; Installation of a new control panel system, electrical service, and emergency generator system.
Lift Station 4 Mitigation
zip
City of Dania Beach
Work includes lift station no 6 mitigation. Bypass pumping 1 ls, removal and salvage/disposal of existing lift station equipment and materials 1 ls, demolition of existing submersible lift station 1 ls, install submersible lift station with valve vault 1 ls, install flow meter vault assembly 1 ls, install 6", dip force main with fittings, open cut 10 lf, install 8", dip force main with fittings, open cut 35 lf, install 8" plug valves 1 ea, install force main air release valve 1 ea, install 18", pvc gravity sewer 10 lf, install 1-inch hdpe water service with rpz and hose bib 1 ls, install/modify electrical service 1 ls, install control panel system and electrical lift station components 1 ls, install emergency generator system 1 ls. See outside link.
Camrosa Water District
Work includes approx. 1 LS of temporary bypassing; 1 LS of sheeting, shoring, and excavation safety measures; 1 LS of sanitary sewer force main tie-in to existing line; 1 LS of wet well modifications, access hatch, and lid; 1 LS of site lighting; 1 LS of pumps, motors, and VFDs; 1 LS of lift station piping and appurtenances; 1 LS of electrical, controls, and instrumentation; 1 LS of lift station site improvements; see outside link for more details.
City of Long Beach
Work consists of 1 LS Mobilization and Demobilization; 1 LS Lift Station 2 Improvements; 1 LS Lift Station 5 Improvements; 1 LS Breakers Lift Station Improvements; 10 CY Unsuitable Excavation; 1 LS Lift Station 2 Bypass Pumping; 1 LS Lift Station 5 Bypass Pumping; 1 LS Breakers Lift Station Bypass Pumping; 1 LS Lift Station 2 Electrical; 1 LS Lift Station 5 Electrical; 1 LS Breakers Lift Station Electrical.
Release
Oct 14, 2025
Close
Nov 14, 2025