Retrieving RFP details
Release
Close
Camrosa Water District
Work includes approx. 1 LS of temporary bypassing; 1 LS of sheeting, shoring, and excavation safety measures; 1 LS of sanitary sewer force main tie-in to existing line; 1 LS of wet well modifications, access hatch, and lid; 1 LS of site lighting; 1 LS of pumps, motors, and VFDs; 1 LS of lift station piping and appurtenances; 1 LS of electrical, controls, and instrumentation; 1 LS of lift station site improvements; see outside link for more details.
City of Baytown
The project consists of approx, to install and furnish a new sanitary sewer lift station, including wet well, pumps, valves, piping, electrical equipment building and generator platforms, electrical equipment, generator, gas service line, water service line, coordination of utility service connections, driveway, fencing, and site grading. Demolition of existing lift station and rehabilitation of existing wet well and sanitary sewer lines as shown on plans. Installation of approximately 185 linear feet 12" water line including valves and appurtenances. See outside link for more details.
City of Hallandale Beach
The work to be performed includes site, civil, mechanical, structural and electrical work associated with the Lift Station # 9 Rehabilitation Project . This project consists of the removal of two existing sanitary sewer pumps, associated piping, valves, fittings, supports, and electrical items including the existing diesel generator from the existing lift station, removal and replacement of the existing wet well top and valve vault, installation of a new meter vault, flow meter and three new submersible wastewater pumps along with the associated piping, valves, fittings, supports, electrical items including a variable frequency drive, reconnecting the new piping to the force main, installation of a new diesel generator, drum scrubber, driveway, fence
City of Booneville
The Project includes the rehabilitation of an existing 100 GPM Lift Station. To included new submersible pumps, control panel, station piping, valve pit, fencing and site work.
Release
Oct 23, 2025
Close
Dec 04, 2025