Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Liberty City Water Supply Corporation
Provide two (2) 60 kw diesel powered generators with concrete pads, automatic transfer switches, and related appurtenances. One (1) 35 kw diesel powered generator with concrete pads, automatic transfer switch, and related appurtenances. One (1) 200 kw diesel powered generator with concrete pads, automatic transfer switches, and related appurtenances.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Navarro County Emergency Services District 1
Project consists of a Base Bid to furnish and install two (2) emergency generators at two (2) separate pump station locations (Pump Station No. 3 and No. 7A) with all other associated appurtenances. A 150kW and 100kW generator shall be furnished and installed at Pump Station No. 3 and No. 7A, respectively. The Project also includes an Additive Alternate Bid to furnish and install a 100kW emergency generator and replace the existing electric panel with all other associated appurtenances at Pump Station No. 1.
Posted Date
Nov 18, 2025
Due Date
Dec 18, 2025
Release: Nov 18, 2025
Navarro County Emergency Services District 1
Close: Dec 18, 2025
Project consists of a Base Bid to furnish and install two (2) emergency generators at two (2) separate pump station locations (Pump Station No. 3 and No. 7A) with all other associated appurtenances. A 150kW and 100kW generator shall be furnished and installed at Pump Station No. 3 and No. 7A, respectively. The Project also includes an Additive Alternate Bid to furnish and install a 100kW emergency generator and replace the existing electric panel with all other associated appurtenances at Pump Station No. 1.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Roma
Purchase and installation of new 500kw and 250kw generators at the wtp and high service pump station. Work includes new 800a ats and 600a ats, all electrical and scada integration, bonding and insurance and miscellaneous improvements.
Posted Date
Oct 29, 2025
Due Date
Dec 3, 2025
Release: Oct 29, 2025
City of Roma
Close: Dec 3, 2025
Purchase and installation of new 500kw and 250kw generators at the wtp and high service pump station. Work includes new 800a ats and 600a ats, all electrical and scada integration, bonding and insurance and miscellaneous improvements.
AvailableCity of Vidalia
Supply, design, construction, and installation of generators at city venues. Two (2) - 200 kw, three-phase, diesel-powered, standby generators, one (1) - 175 kw, three-phase, diesel-powered, standby generator, two (2) - 80 kw, three-phase, diesel-powered, standby generators, one (1) 125 kw, three-phase, diesel-powered, standby generator, one (1) 40 kw, single-phase, diesel-powered, standby generator, two (2) 25 kw, single-phase, diesel-powered, standby generators.
Posted Date
Oct 27, 2025
Due Date
Dec 1, 2025
Release: Oct 27, 2025
City of Vidalia
Close: Dec 1, 2025
Supply, design, construction, and installation of generators at city venues. Two (2) - 200 kw, three-phase, diesel-powered, standby generators, one (1) - 175 kw, three-phase, diesel-powered, standby generator, two (2) - 80 kw, three-phase, diesel-powered, standby generators, one (1) 125 kw, three-phase, diesel-powered, standby generator, one (1) 40 kw, single-phase, diesel-powered, standby generator, two (2) 25 kw, single-phase, diesel-powered, standby generators.
AvailableWalker County
Diesel Generators.
Posted Date
Nov 18, 2025
Due Date
Dec 17, 2025
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →