Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replace existing timber pier, gangway, and floating dock with a timber stationary pier, aluminum gangway, and aluminum floating courtesy dock.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Replacement of the fuel island.
Posted Date
Nov 25, 2025
Due Date
Dec 17, 2025
Release: Nov 25, 2025
Close: Dec 17, 2025
Replacement of the fuel island.
AvailablePremium
Access the largest public sector contact database
Fuel island replacement project.
Posted Date
Nov 25, 2025
Due Date
Dec 17, 2025
Release: Nov 25, 2025
Close: Dec 17, 2025
Fuel island replacement project.
AvailableThe City of Framingham is soliciting qualifications from an Architectural/Engineering (AE) design services firm to provide design services for the Lexington Street Main Library roof replacement at 49 Lexington Street, Framingham, MA. RFQ documents will be available via the City’s Bidnet portal (available Wednesday, December 10, 2025 after 10:00 AM) and proposals must be submitted through Bidnet by December 29, 2025 at 10:00 AM Eastern. A non-mandatory pre-site visit is scheduled for December 16, 2025 at 10:00 AM at the library; contact Audra Shaw, Procurement Administrator, for questions.
Posted Date
Dec 3, 2025
Due Date
Dec 29, 2025
Release: Dec 3, 2025
Close: Dec 29, 2025
The City of Framingham is soliciting qualifications from an Architectural/Engineering (AE) design services firm to provide design services for the Lexington Street Main Library roof replacement at 49 Lexington Street, Framingham, MA. RFQ documents will be available via the City’s Bidnet portal (available Wednesday, December 10, 2025 after 10:00 AM) and proposals must be submitted through Bidnet by December 29, 2025 at 10:00 AM Eastern. A non-mandatory pre-site visit is scheduled for December 16, 2025 at 10:00 AM at the library; contact Audra Shaw, Procurement Administrator, for questions.
AvailableWork consists of replacement of underground storage tanks and associated piping, dispensers, fuel island specific electrical, leak detection equipment, site demolition and metal fencing.
Posted Date
Dec 9, 2025
Due Date
Jan 22, 2026
Release: Dec 9, 2025
Close: Jan 22, 2026
Work consists of replacement of underground storage tanks and associated piping, dispensers, fuel island specific electrical, leak detection equipment, site demolition and metal fencing.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis