Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Hartford County Metropolitan District
Provide for approximately 9,000 lf of cured-in-place (cipp) pipe lining, cctv of 9,000 lf of sewer main prior to rehabilitation, reconnection of 350 active service laterals, 700 lf of sewer main replacement, 20 point repairs, 3 new precast concrete sewer manholes, 550 vf of sewer manhole monolithic cementitious lining, rehabilitation of 50 mh chimneys, along with support equipment and accessories.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Base Portsmouth (00027)
Combined sewer overflow rehabilitation project - phase 2. Performing sewer rehabilitation located in the northern portion of the Metropolitan Sewer District's Service Area. Perform sewer rehabilitation of approx. 3,472 LF of sewers, sized at 24" in diameter utilizing Cured-In-Place Pipe (CIPP) methods. The project is within the MSD Boundaries.
Posted Date
Nov 7, 2025
Due Date
Nov 28, 2025
Release: Nov 7, 2025
Base Portsmouth (00027)
Close: Nov 28, 2025
Combined sewer overflow rehabilitation project - phase 2. Performing sewer rehabilitation located in the northern portion of the Metropolitan Sewer District's Service Area. Perform sewer rehabilitation of approx. 3,472 LF of sewers, sized at 24" in diameter utilizing Cured-In-Place Pipe (CIPP) methods. The project is within the MSD Boundaries.
AvailableCity of Boise
Work includes: CIP rehabilitation of approx. 8 LF 8", 1,618 LF 27" and 866 LF 33" concrete sewer main using fiberglass UC CIP liner along with service reconnections, service reinstatements, and lining of existing manholes. Work is located on University Drive, with approx total footage of 2,492 LF includes 1 LS bypass sewage pumping, 1 EA cut-off protruding service, 1 EA service reinstatement w/LMK trenchess 27"x8" service line, 50 LF asbestos concrete pipe removal and disposal, 12 EA coat sanitary sewer manhole, 79 LF replacement 4" service line open-cut (pavement), 1 EA service line verification type and size, 6 EA modify manhole type 2 (major), 2,484 LF heavy cleaning (pre or post-rehabilitation) - size, 1 EA service lateral CCTV inspection-mailine launch - (pre-rehabilitation).
Posted Date
Nov 6, 2025
Due Date
Nov 19, 2025
Release: Nov 6, 2025
City of Boise
Close: Nov 19, 2025
Work includes: CIP rehabilitation of approx. 8 LF 8", 1,618 LF 27" and 866 LF 33" concrete sewer main using fiberglass UC CIP liner along with service reconnections, service reinstatements, and lining of existing manholes. Work is located on University Drive, with approx total footage of 2,492 LF includes 1 LS bypass sewage pumping, 1 EA cut-off protruding service, 1 EA service reinstatement w/LMK trenchess 27"x8" service line, 50 LF asbestos concrete pipe removal and disposal, 12 EA coat sanitary sewer manhole, 79 LF replacement 4" service line open-cut (pavement), 1 EA service line verification type and size, 6 EA modify manhole type 2 (major), 2,484 LF heavy cleaning (pre or post-rehabilitation) - size, 1 EA service lateral CCTV inspection-mailine launch - (pre-rehabilitation).
AvailableTown of Spencer
675 LF pipe 8" CIPP, all depths; 10 EA pipe lateral reinstatement; 170 LF pipe 8" CIPP, all depths; 2 EA pipe lateral reinstatement; 335 LF pipe 8" CIPP, all depths; 2 EA pipe lateral reinstatement.
Posted Date
Oct 22, 2025
Due Date
Nov 20, 2025
Release: Oct 22, 2025
Town of Spencer
Close: Nov 20, 2025
675 LF pipe 8" CIPP, all depths; 10 EA pipe lateral reinstatement; 170 LF pipe 8" CIPP, all depths; 2 EA pipe lateral reinstatement; 335 LF pipe 8" CIPP, all depths; 2 EA pipe lateral reinstatement.
AvailableCity of Madison
Metro transit phase 3A maintenance and driver facility improvements. See outside link.
Posted Date
Nov 1, 2024
Due Date
Dec 18, 2025
Release: Nov 1, 2024
City of Madison
Close: Dec 18, 2025
Metro transit phase 3A maintenance and driver facility improvements. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis