Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Town of Spencer
675 LF pipe 8" CIPP, all depths; 10 EA pipe lateral reinstatement; 170 LF pipe 8" CIPP, all depths; 2 EA pipe lateral reinstatement; 335 LF pipe 8" CIPP, all depths; 2 EA pipe lateral reinstatement.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Base Portsmouth (00027)
Combined sewer overflow rehabilitation project - phase 2. Performing sewer rehabilitation located in the northern portion of the Metropolitan Sewer District's Service Area. Perform sewer rehabilitation of approx. 3,472 LF of sewers, sized at 24" in diameter utilizing Cured-In-Place Pipe (CIPP) methods. The project is within the MSD Boundaries.
Posted Date
Nov 7, 2025
Due Date
Nov 28, 2025
Release: Nov 7, 2025
Base Portsmouth (00027)
Close: Nov 28, 2025
Combined sewer overflow rehabilitation project - phase 2. Performing sewer rehabilitation located in the northern portion of the Metropolitan Sewer District's Service Area. Perform sewer rehabilitation of approx. 3,472 LF of sewers, sized at 24" in diameter utilizing Cured-In-Place Pipe (CIPP) methods. The project is within the MSD Boundaries.
AvailableHartford County Metropolitan District
Provide for approximately 9,000 lf of cured-in-place (cipp) pipe lining, cctv of 9,000 lf of sewer main prior to rehabilitation, reconnection of 350 active service laterals, 700 lf of sewer main replacement, 20 point repairs, 3 new precast concrete sewer manholes, 550 vf of sewer manhole monolithic cementitious lining, rehabilitation of 50 mh chimneys, along with support equipment and accessories.
Posted Date
Nov 5, 2025
Due Date
Dec 10, 2025
Release: Nov 5, 2025
Hartford County Metropolitan District
Close: Dec 10, 2025
Provide for approximately 9,000 lf of cured-in-place (cipp) pipe lining, cctv of 9,000 lf of sewer main prior to rehabilitation, reconnection of 350 active service laterals, 700 lf of sewer main replacement, 20 point repairs, 3 new precast concrete sewer manholes, 550 vf of sewer manhole monolithic cementitious lining, rehabilitation of 50 mh chimneys, along with support equipment and accessories.
AvailableNapa Sanitation District
Work consists of rehabilitation and/or replacement of 6" and 8" sewer mains, approx 13,311 LF by pipe bursting and 994 LF by open-cut. Also included rehabilitation or replacement of approx 368 lower laterals, 358 upper laterals, and approximately 60 sewer structures in the project area.
Posted Date
Nov 5, 2025
Due Date
Jan 13, 2026
Release: Nov 5, 2025
Napa Sanitation District
Close: Jan 13, 2026
Work consists of rehabilitation and/or replacement of 6" and 8" sewer mains, approx 13,311 LF by pipe bursting and 994 LF by open-cut. Also included rehabilitation or replacement of approx 368 lower laterals, 358 upper laterals, and approximately 60 sewer structures in the project area.
AvailableCity of Jerseyville
The City of Jerseyville intends to construct Pleasant Street Drainage Improvements β Phase 2, including storm sewer construction, lining, grading, and pavement patching. Bids are due December 17, 2025.
Posted Date
-
Due Date
Dec 17, 2025
City of Jerseyville
Close: Dec 17, 2025
The City of Jerseyville intends to construct Pleasant Street Drainage Improvements β Phase 2, including storm sewer construction, lining, grading, and pavement patching. Bids are due December 17, 2025.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis