Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Bedford County solicits sealed bids to furnish all materials, labor, and equipment for construction of the final cover system for Phase I Cells A, B, and C (approx. 25 acres) at the Bedford County Landfill. A mandatory pre-bid meeting is scheduled for November 13, 2025 at 11:00 AM local time (1060 Recycle Rd, Bedford, VA). Bidders must follow specified submission requirements and bid form documents posted with the solicitation.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Construction of the final cover system for Phase I Cells A, B, and C on approx. 25 acres at the Bedford County Landfill.
Posted Date
Nov 30, 2025
Due Date
Dec 18, 2025
Release: Nov 30, 2025
Close: Dec 18, 2025
Construction of the final cover system for Phase I Cells A, B, and C on approx. 25 acres at the Bedford County Landfill.
AvailableConstruction of a side slope final closure, appurtenances and associated site improvements over approx. 23.6 acres at the Landfill, as well as the restoration and reconstruction of two (2) existing downchutes at the closed portion of the landfill.
Posted Date
Dec 2, 2025
Due Date
Feb 3, 2026
Release: Dec 2, 2025
Close: Feb 3, 2026
Construction of a side slope final closure, appurtenances and associated site improvements over approx. 23.6 acres at the Landfill, as well as the restoration and reconstruction of two (2) existing downchutes at the closed portion of the landfill.
AvailableWork includes 12,500 CY relocation of excavated waste from refuse limit potholing and clean closure aera to reconsolidation area; 22,500 CY unclassified fill/foundation fill soil material (19,600 CY + 2,300 CY to make grades); 305,000 SF foundation soil layer placement; 18,500 CY unclassified excavation; 6,200 CY import soil material; 212,000 SF 60 mil lldpe super grip net geomembrane-slope (per detail 1/d1); 84,000 SF 60 mil lldpe super grip net geomembrane-deck (per detail 2/d1). See attached file.
Posted Date
Nov 20, 2025
Due Date
Jan 15, 2026
Release: Nov 20, 2025
Close: Jan 15, 2026
Work includes 12,500 CY relocation of excavated waste from refuse limit potholing and clean closure aera to reconsolidation area; 22,500 CY unclassified fill/foundation fill soil material (19,600 CY + 2,300 CY to make grades); 305,000 SF foundation soil layer placement; 18,500 CY unclassified excavation; 6,200 CY import soil material; 212,000 SF 60 mil lldpe super grip net geomembrane-slope (per detail 1/d1); 84,000 SF 60 mil lldpe super grip net geomembrane-deck (per detail 2/d1). See attached file.
AvailableWork includes 12,500 CY relocation of excavated waste from refuse limit potholing and clean closure aera to reconsolidation area; 22,500 CY unclassified fill/foundation fill soil material (19,600 CY + 2,300 CY to make grades); 305,000 SF foundation soil layer placement; 18,500 CY unclassified excavation; 6,200 CY import soil material; 212,000 SF 60 mil lldpe super grip net geomembrane-slope (per detail 1/d1); 84,000 SF 60 mil lldpe super grip net geomembrane-deck (per detail 2/d1). See attached file.
Posted Date
Nov 20, 2025
Due Date
Jan 15, 2026
Release: Nov 20, 2025
Close: Jan 15, 2026
Work includes 12,500 CY relocation of excavated waste from refuse limit potholing and clean closure aera to reconsolidation area; 22,500 CY unclassified fill/foundation fill soil material (19,600 CY + 2,300 CY to make grades); 305,000 SF foundation soil layer placement; 18,500 CY unclassified excavation; 6,200 CY import soil material; 212,000 SF 60 mil lldpe super grip net geomembrane-slope (per detail 1/d1); 84,000 SF 60 mil lldpe super grip net geomembrane-deck (per detail 2/d1). See attached file.