Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
University Of Kentucky
Upper concourse concrete & waterproofing repairs. Prepare and install a waterproofing membrane on the structural slab, stairs, and bridges. Work includes replacement of sealants. Repair of concrete deterioration and rebuild the slab edge at concourse expansion joints. Replace concourse expansion joints. North loft club seating concrete & waterproofing repairs. The loft club seating repairs occur between stadium gate 1 and gate 4. The work focuses on the precast concrete seating units at row 1 through row 7 in section 101 through section 210. Repairs include removal and replacement of the waterproofing membrane and all sealants at the precast seating units. Rewelding and repairs of steel connections between precast seating units, repairs at rails, and installation of supplemental steel brackets. Repair of concrete deterioration at the precast seating units and support framing. Preparation and painting of steel framing, support members, and concrete wall panels. Installation of new drains at the lower row and repairs at existing drains. The existing bleacher-style and regular seats will be temporarily removed and reinstalled upon completion of the work in the loft club seating.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
University Of Kentucky
The lower seating repairs occur between stadium gate 1 and gate 4. The work focuses on the precast concrete seating units at row 1 through row 51 in section 1 through section 11. Repairs include removal and replacement of the waterproofing membrane and all sealants at the precast seating units. Rewelding and repairs of steel connections between precast seating units, repairs at rails, and installation of supplemental steel brackets. Repair of concrete deterioration at the precast seating units and support framing. Installation of new drains at the lower row and repairs at existing drains. Preparation and painting of steel framing, support members, and concrete wall panels. The existing bleacher-style seats will be temporarily removed and reinstalled upon completion of the work in the lower seating.
Posted Date
-
Due Date
Dec 16, 2025
University Of Kentucky
Close: Dec 16, 2025
The lower seating repairs occur between stadium gate 1 and gate 4. The work focuses on the precast concrete seating units at row 1 through row 51 in section 1 through section 11. Repairs include removal and replacement of the waterproofing membrane and all sealants at the precast seating units. Rewelding and repairs of steel connections between precast seating units, repairs at rails, and installation of supplemental steel brackets. Repair of concrete deterioration at the precast seating units and support framing. Installation of new drains at the lower row and repairs at existing drains. Preparation and painting of steel framing, support members, and concrete wall panels. The existing bleacher-style seats will be temporarily removed and reinstalled upon completion of the work in the lower seating.
AvailableRadford University
Work includes removal and replacement of insulation and waterproofing systems on existing exterior ductwork; and removal and reinstallation of existing metal siding; and repairs to waterproofing systems on existing exterior plenums.
Posted Date
Nov 7, 2025
Due Date
Dec 10, 2025
Release: Nov 7, 2025
Radford University
Close: Dec 10, 2025
Work includes removal and replacement of insulation and waterproofing systems on existing exterior ductwork; and removal and reinstallation of existing metal siding; and repairs to waterproofing systems on existing exterior plenums.
AvailablePurdue University Main Campus
Work include pedestrian tunnel repairs and waterproofing.
Posted Date
Nov 14, 2025
Due Date
Dec 18, 2025
Release: Nov 14, 2025
Purdue University Main Campus
Close: Dec 18, 2025
Work include pedestrian tunnel repairs and waterproofing.
AvailableCity of Baltimore
Work include tunnel - structural repairs and waterproofing.
Posted Date
Nov 10, 2025
Due Date
Dec 17, 2025
Release: Nov 10, 2025
City of Baltimore
Close: Dec 17, 2025
Work include tunnel - structural repairs and waterproofing.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis