Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Radford University
Work includes removal and replacement of insulation and waterproofing systems on existing exterior ductwork; and removal and reinstallation of existing metal siding; and repairs to waterproofing systems on existing exterior plenums.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Suny Fashion Institute Of Technology
Business center BC11 MER. replacement of insulation
Posted Date
Oct 27, 2025
Due Date
Dec 10, 2025
Release: Oct 27, 2025
Suny Fashion Institute Of Technology
Close: Dec 10, 2025
Business center BC11 MER. replacement of insulation
AvailableSuny Upstate Medical University
Business Center BC11 MER Replacement of Insulation.
Posted Date
Nov 12, 2025
Due Date
Dec 19, 2025
Release: Nov 12, 2025
Suny Upstate Medical University
Close: Dec 19, 2025
Business Center BC11 MER Replacement of Insulation.
AvailableUniversity Of Kentucky
Upper concourse concrete & waterproofing repairs. Prepare and install a waterproofing membrane on the structural slab, stairs, and bridges. Work includes replacement of sealants. Repair of concrete deterioration and rebuild the slab edge at concourse expansion joints. Replace concourse expansion joints. North loft club seating concrete & waterproofing repairs. The loft club seating repairs occur between stadium gate 1 and gate 4. The work focuses on the precast concrete seating units at row 1 through row 7 in section 101 through section 210. Repairs include removal and replacement of the waterproofing membrane and all sealants at the precast seating units. Rewelding and repairs of steel connections between precast seating units, repairs at rails, and installation of supplemental steel brackets. Repair of concrete deterioration at the precast seating units and support framing. Preparation and painting of steel framing, support members, and concrete wall panels. Installation of new drains at the lower row and repairs at existing drains. The existing bleacher-style and regular seats will be temporarily removed and reinstalled upon completion of the work in the loft club seating.
Posted Date
-
Due Date
Dec 9, 2025
University Of Kentucky
Close: Dec 9, 2025
Upper concourse concrete & waterproofing repairs. Prepare and install a waterproofing membrane on the structural slab, stairs, and bridges. Work includes replacement of sealants. Repair of concrete deterioration and rebuild the slab edge at concourse expansion joints. Replace concourse expansion joints. North loft club seating concrete & waterproofing repairs. The loft club seating repairs occur between stadium gate 1 and gate 4. The work focuses on the precast concrete seating units at row 1 through row 7 in section 101 through section 210. Repairs include removal and replacement of the waterproofing membrane and all sealants at the precast seating units. Rewelding and repairs of steel connections between precast seating units, repairs at rails, and installation of supplemental steel brackets. Repair of concrete deterioration at the precast seating units and support framing. Preparation and painting of steel framing, support members, and concrete wall panels. Installation of new drains at the lower row and repairs at existing drains. The existing bleacher-style and regular seats will be temporarily removed and reinstalled upon completion of the work in the loft club seating.
AvailablePurdue University Main Campus
Work include pedestrian tunnel repairs and waterproofing.
Posted Date
Nov 14, 2025
Due Date
Dec 18, 2025
Release: Nov 14, 2025
Purdue University Main Campus
Close: Dec 18, 2025
Work include pedestrian tunnel repairs and waterproofing.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis