Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Idaho Transportation Department
Bridge Repairs.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Idaho Transportation Department
Work includes approx 1,499.2 LF strip seal expansion joint; 36 SF patch and repair of concrete surface; 26,448 LF temporary pavement marking-waterborne; 1,779 SY concrete bridge deck removal class A. See outside link.
Posted Date
Nov 10, 2025
Due Date
Dec 2, 2025
Release: Nov 10, 2025
Idaho Transportation Department
Close: Dec 2, 2025
Work includes approx 1,499.2 LF strip seal expansion joint; 36 SF patch and repair of concrete surface; 26,448 LF temporary pavement marking-waterborne; 1,779 SY concrete bridge deck removal class A. See outside link.
AvailableWashington State Department of Transportation
Removing portions of one existing bridge, reconstructing the bridge superstructure, traffic control and other work includes 21 CY structure excavation class A incl. haul, 81 LF prestressed conc. girder W50G, 16.2 ton crushed surfacing base course, 2.1 ton HMA for pavement repair CL 3/8" PG 58H-22, 381 SF construction signs class A, 9 CY controlled density fill.
Posted Date
Oct 29, 2025
Due Date
Dec 3, 2025
Release: Oct 29, 2025
Washington State Department of Transportation
Close: Dec 3, 2025
Removing portions of one existing bridge, reconstructing the bridge superstructure, traffic control and other work includes 21 CY structure excavation class A incl. haul, 81 LF prestressed conc. girder W50G, 16.2 ton crushed surfacing base course, 2.1 ton HMA for pavement repair CL 3/8" PG 58H-22, 381 SF construction signs class A, 9 CY controlled density fill.
AvailableOklahoma Department of Transportation
Bridge rehabilitation. Work includes clearing and grubbing; 500 SY of solid slab sodding; 93 Ton type S4 superpave; 400 LF of W-beam single beam guardrail; 1,369 SY of special concrete finish; 51 CY of Cl AA concrete; 1 LS painting of existing structures; 90 SY of Cl B bridge deck repair; 774 SF of carbon fiber-reinforced polymer. See attached file.
Posted Date
Oct 23, 2025
Due Date
Nov 20, 2025
Release: Oct 23, 2025
Oklahoma Department of Transportation
Close: Nov 20, 2025
Bridge rehabilitation. Work includes clearing and grubbing; 500 SY of solid slab sodding; 93 Ton type S4 superpave; 400 LF of W-beam single beam guardrail; 1,369 SY of special concrete finish; 51 CY of Cl AA concrete; 1 LS painting of existing structures; 90 SY of Cl B bridge deck repair; 774 SF of carbon fiber-reinforced polymer. See attached file.
AvailableElmore County
Bridge Maintenance-Painting and Bridge Guardrail Installation & Repair.
Posted Date
Oct 15, 2025
Due Date
Nov 19, 2025
Release: Oct 15, 2025
Elmore County
Close: Nov 19, 2025
Bridge Maintenance-Painting and Bridge Guardrail Installation & Repair.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis