Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Washington State Department of Transportation
Removing portions of one existing bridge, reconstructing the bridge superstructure, traffic control and other work includes 21 CY structure excavation class A incl. haul, 81 LF prestressed conc. girder W50G, 16.2 ton crushed surfacing base course, 2.1 ton HMA for pavement repair CL 3/8" PG 58H-22, 381 SF construction signs class A, 9 CY controlled density fill.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Greene County
Work includes emergency road and bridge repair.
Posted Date
Nov 6, 2025
Due Date
Dec 17, 2025
Release: Nov 6, 2025
Greene County
Close: Dec 17, 2025
Work includes emergency road and bridge repair.
AvailableJones County
Three bridge replacement sites: bridge A : 1 @ 31 LF, 2 @ 40 LF, 1 @ 110 LF, 1 @ 40 LF, 2 @ 31 LF prestressed concrete beam span; bridge B : 3 @ 40 LF precast concrete span; and bridge c : 3 @ 40 LF precast concrete span and approaches on 0.700 miles.
Posted Date
Aug 22, 2025
Due Date
Nov 25, 2025
Release: Aug 22, 2025
Jones County
Close: Nov 25, 2025
Three bridge replacement sites: bridge A : 1 @ 31 LF, 2 @ 40 LF, 1 @ 110 LF, 1 @ 40 LF, 2 @ 31 LF prestressed concrete beam span; bridge B : 3 @ 40 LF precast concrete span; and bridge c : 3 @ 40 LF precast concrete span and approaches on 0.700 miles.
AvailableElmore County
Bridge Maintenance-Painting and Bridge Guardrail Installation & Repair.
Posted Date
Oct 15, 2025
Due Date
Nov 19, 2025
Release: Oct 15, 2025
Elmore County
Close: Nov 19, 2025
Bridge Maintenance-Painting and Bridge Guardrail Installation & Repair.
AvailableState College Area School District
Perform south bridge repair. Work includes flooring; installation of self-leveling floor compound in the project area; repair existing brick in corridor.
Posted Date
Oct 21, 2025
Due Date
Nov 24, 2025
Release: Oct 21, 2025
State College Area School District
Close: Nov 24, 2025
Perform south bridge repair. Work includes flooring; installation of self-leveling floor compound in the project area; repair existing brick in corridor.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis