Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This RFP is for the KANSAS STREET SEWER FORCE MAIN REPLACEMENT PROJECT.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Sewer force main replacement project.
Posted Date
Nov 5, 2025
Due Date
Dec 12, 2025
Release: Nov 5, 2025
Close: Dec 12, 2025
Sewer force main replacement project.
Premium
Access the largest public sector contact database
Work of this project consists of the installation of a new force main and replacement/rehabilitation of existing gravity sewer, that will eventually connect into the newly constructed pump station.
Posted Date
Nov 11, 2025
Due Date
Jan 6, 2026
Release: Nov 11, 2025
Close: Jan 6, 2026
Work of this project consists of the installation of a new force main and replacement/rehabilitation of existing gravity sewer, that will eventually connect into the newly constructed pump station.
AvailableThe work includes: installation of gravity and force main sewer pipes, sewer manholes, air release manholes, pump station, trench repair, earthwork, and all associated work as shown on the contract drawings and documents. The work also includes trenching, backfilling, and road pavement repair associated with utility installation. The work includes, but is not limited to: The installation of 2,000 LF of gravity sewer, 1,530 LF of new sewer force main, installation of precast manholes, installation of residential services, and associated construction; Road repair, including the removal of bituminous pavement, trench paving, street reconstruction, loam, and seeding; Installation of the pump station, valve pit, electrical controls, emergency generator, and drive for access to the pump station.
Posted Date
Dec 8, 2025
Due Date
Jan 14, 2026
Release: Dec 8, 2025
Close: Jan 14, 2026
The work includes: installation of gravity and force main sewer pipes, sewer manholes, air release manholes, pump station, trench repair, earthwork, and all associated work as shown on the contract drawings and documents. The work also includes trenching, backfilling, and road pavement repair associated with utility installation. The work includes, but is not limited to: The installation of 2,000 LF of gravity sewer, 1,530 LF of new sewer force main, installation of precast manholes, installation of residential services, and associated construction; Road repair, including the removal of bituminous pavement, trench paving, street reconstruction, loam, and seeding; Installation of the pump station, valve pit, electrical controls, emergency generator, and drive for access to the pump station.
AvailableWork consists of replacement of water mains. See outside link.
Posted Date
Nov 10, 2025
Due Date
Dec 17, 2025
Release: Nov 10, 2025
Close: Dec 17, 2025
Work consists of replacement of water mains. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis