Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Morongo Basin Pipeline (MBP) is a pipeline that runs from the California Aqueduct, under the Mojave River and through the Johnson Valley Pump Station, finally heading to the Yucca Valley region delivering about five cubic feet per second of water, year around. This consistent delivery makes...
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work include pump station rehabilitation. Works includes electrical.
Posted Date
Dec 8, 2025
Due Date
Jan 13, 2026
Release: Dec 8, 2025
Close: Jan 13, 2026
Work include pump station rehabilitation. Works includes electrical.
AvailablePremium
Access the largest public sector contact database
The City of Norfolk is requesting Statements of Qualifications from design‑build teams to provide turnkey design and construction services for the Harbor Park Pump Station. This Phase One RFQ precedes a Phase Two RFP and covers a new stormwater pump station and associated site improvements in Norfolk, VA.
Posted Date
Nov 3, 2025
Due Date
Dec 12, 2025
Release: Nov 3, 2025
Close: Dec 12, 2025
The City of Norfolk is requesting Statements of Qualifications from design‑build teams to provide turnkey design and construction services for the Harbor Park Pump Station. This Phase One RFQ precedes a Phase Two RFP and covers a new stormwater pump station and associated site improvements in Norfolk, VA.
Kennebunk Sewer District seeks engineering design services for upgrading the Boothby Road Pump Station in Kennebunk, Maine. The project involves evaluating and upgrading the existing pump station to improve resilience against flooding, reusing existing pumps, and incorporating a new wet well with increased capacity. The selected firm will provide bid-ready construction documents and prepare necessary permit applications.
Posted Date
Oct 31, 2025
Due Date
Dec 30, 2025
Release: Oct 31, 2025
Close: Dec 30, 2025
Kennebunk Sewer District seeks engineering design services for upgrading the Boothby Road Pump Station in Kennebunk, Maine. The project involves evaluating and upgrading the existing pump station to improve resilience against flooding, reusing existing pumps, and incorporating a new wet well with increased capacity. The selected firm will provide bid-ready construction documents and prepare necessary permit applications.
AvailableComplete the electrical installation for the new owner-furnished, factory-built packaged pump station. The pump station enclosure, pumps, and control systems are substantially prewired by the manufacturer; however, the electrical contractor shall provide incoming service to the control panel, grounding of the station, and all conduit, wiring, and terminations necessary to connect field-installed equipment to the factory-supplied terminal blocks.
Posted Date
Dec 4, 2025
Due Date
Jan 5, 2026
Release: Dec 4, 2025
Close: Jan 5, 2026
Complete the electrical installation for the new owner-furnished, factory-built packaged pump station. The pump station enclosure, pumps, and control systems are substantially prewired by the manufacturer; however, the electrical contractor shall provide incoming service to the control panel, grounding of the station, and all conduit, wiring, and terminations necessary to connect field-installed equipment to the factory-supplied terminal blocks.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis