Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement for the construction and renovation of the Orange County Board of Elections Building, including an 1800 sq ft addition and a new loading dock with associated structural, HVAC, electrical, and plumbing work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
An approx 1,800 SF addition will be constructed at the rear of the building in place of an existing terraced courtyard. In addition, a loading dock will be added at the southwest corner of the building. Construction will include concrete foundations with steel frame structure, metal stud framing and brick veneer, steel roof structure with a low slope membrane roof.
Posted Date
Nov 14, 2025
Due Date
Jan 15, 2026
Release: Nov 14, 2025
Close: Jan 15, 2026
An approx 1,800 SF addition will be constructed at the rear of the building in place of an existing terraced courtyard. In addition, a loading dock will be added at the southwest corner of the building. Construction will include concrete foundations with steel frame structure, metal stud framing and brick veneer, steel roof structure with a low slope membrane roof.
Premium
Access the largest public sector contact database
Wastewater treatment facility (WWTF) expansion.
Posted Date
Oct 23, 2025
Due Date
Jan 8, 2026
Release: Oct 23, 2025
Close: Jan 8, 2026
Wastewater treatment facility (WWTF) expansion.
AvailableThe project is for a single Prime Contract (general, mechanical and electrical combined) for the expansion and renovation of two restrooms in an existing building.
Posted Date
Dec 9, 2025
Due Date
Jan 5, 2026
Release: Dec 9, 2025
Close: Jan 5, 2026
The project is for a single Prime Contract (general, mechanical and electrical combined) for the expansion and renovation of two restrooms in an existing building.
AvailableThe School Board of Orange County, Virginia is conducting a PPEA procurement for a new Career Technology Education (CTE) Building at Orange County High School, with project documentation available on the Orange County School System capital projects page. Proposals are due December 23, 2025 at 7:00 PM and the opportunity is listed as active.
Posted Date
-
Due Date
Dec 23, 2025
Close: Dec 23, 2025
The School Board of Orange County, Virginia is conducting a PPEA procurement for a new Career Technology Education (CTE) Building at Orange County High School, with project documentation available on the Orange County School System capital projects page. Proposals are due December 23, 2025 at 7:00 PM and the opportunity is listed as active.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis