Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Alabama Department of Transportation
Work includes constructing the Intersection Improvements (Northbound Thru Lane and Westbound Turn Lane Additions) on SR-13 (US-43) at Rose Boulevard/Mitt Lary Road in Northport. Length 0.256 mi.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Alabama Department of Transportation
Work includes constructing the Intersection Improvements (Northbound Thru Lane and Westbound Turn Lane Additions) on SR-13 (US-43) at Rose Boulevard/Mitt Lary Road in Northport. Length 0.256 mi.
Posted Date
-
Due Date
Dec 5, 2025
Alabama Department of Transportation
Close: Dec 5, 2025
Work includes constructing the Intersection Improvements (Northbound Thru Lane and Westbound Turn Lane Additions) on SR-13 (US-43) at Rose Boulevard/Mitt Lary Road in Northport. Length 0.256 mi.
AvailableWashington State Department of Transportation
Installing a new roundabout at the existing intersection and re-channelizing the adjacent Unnamed Tributary to Campbell Lake through a nearby mitigation site to the east of SR 20. This project will consist of roadway excavation, planing, pigmented concrete installation, paving, curb installation, stormwater work, stream excavation, streambed installation, traffic control and other work. Involves 117 items and 66 working days. Work class 1 - clearing, grubbing, grading and drainage, or class 4 and 17 - asphalt paving and cement concrete curb and gutter.
Posted Date
Nov 3, 2025
Due Date
Dec 3, 2025
Release: Nov 3, 2025
Washington State Department of Transportation
Close: Dec 3, 2025
Installing a new roundabout at the existing intersection and re-channelizing the adjacent Unnamed Tributary to Campbell Lake through a nearby mitigation site to the east of SR 20. This project will consist of roadway excavation, planing, pigmented concrete installation, paving, curb installation, stormwater work, stream excavation, streambed installation, traffic control and other work. Involves 117 items and 66 working days. Work class 1 - clearing, grubbing, grading and drainage, or class 4 and 17 - asphalt paving and cement concrete curb and gutter.
AvailableBelmont County Transportation Improvement District
Belmont County Transportation Improvement District seeks proposals for improving the intersection of US 40 and CR 10, including updating a feasibility study to ODOT standards, preliminary engineering, and environmental services for NEPA clearance. The project may extend to construction contract plan preparation, contingent on funding.
Posted Date
Nov 17, 2025
Due Date
Dec 10, 2025
Release: Nov 17, 2025
Belmont County Transportation Improvement District
Close: Dec 10, 2025
Belmont County Transportation Improvement District seeks proposals for improving the intersection of US 40 and CR 10, including updating a feasibility study to ODOT standards, preliminary engineering, and environmental services for NEPA clearance. The project may extend to construction contract plan preparation, contingent on funding.
AvailableAlabama Department of Transportation
Work includes constructing the Micro-Milling, Resurfacing (Scrub Seal), Guardrail Installation, and Traffic Stripe on SR-118 (US-43) from the intersection of SR-171 to a point 0.430 mile east of the intersection of CR-4 in Gu-Win. Length 4.704 mi.
Posted Date
-
Due Date
Dec 5, 2025
Alabama Department of Transportation
Close: Dec 5, 2025
Work includes constructing the Micro-Milling, Resurfacing (Scrub Seal), Guardrail Installation, and Traffic Stripe on SR-118 (US-43) from the intersection of SR-171 to a point 0.430 mile east of the intersection of CR-4 in Gu-Win. Length 4.704 mi.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis