Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes installment/replacement of (2) pd blowers with supplied db 236 c kaeser blowers. Must be done in sequence to maintain operations of the wastewater system. 460v/3/60hz 25 hp, new units require additional 115v/1/60hz vent and control circuit. 4in npt output (by licensed contractor).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The project includes the following work: The work generally consists of the supply, delivery, supervision of the installation of commissioning of four aeration blowers and related equipment, startup assistance, owner training, and other work. See outside link
Posted Date
Nov 20, 2025
Due Date
Dec 18, 2025
Release: Nov 20, 2025
Close: Dec 18, 2025
The project includes the following work: The work generally consists of the supply, delivery, supervision of the installation of commissioning of four aeration blowers and related equipment, startup assistance, owner training, and other work. See outside link
Premium
Access the largest public sector contact database
Provide Design-build (DB), Replace Backup Power Generation.
Posted Date
Apr 23, 2025
Due Date
Jan 15, 2026
Release: Apr 23, 2025
Close: Jan 15, 2026
Provide Design-build (DB), Replace Backup Power Generation.
AvailableThe project to replace the end of lifecycle chillers at buildings 1, 2 and 104 shall include the following: The project shall replace the standby chiller located on the roof of building 1 above the kitchen. Replace building 2 chillers 1 and 2, modifications to chilled water piping in basement to utilize campus chilled water as backup and remove chiller 3. Replace building 104 operating room backup chiller and relocate to roof of building 104, to include additional piping to relocate chiller to roof. See attached file.
Posted Date
Nov 6, 2025
Due Date
Jan 5, 2026
Release: Nov 6, 2025
Close: Jan 5, 2026
The project to replace the end of lifecycle chillers at buildings 1, 2 and 104 shall include the following: The project shall replace the standby chiller located on the roof of building 1 above the kitchen. Replace building 2 chillers 1 and 2, modifications to chilled water piping in basement to utilize campus chilled water as backup and remove chiller 3. Replace building 104 operating room backup chiller and relocate to roof of building 104, to include additional piping to relocate chiller to roof. See attached file.
AvailableReplace old controllers, install new network switches, PTZ, integration to ATMS install new fiber at 20 signals. See outside link.
Posted Date
Dec 9, 2025
Due Date
Jan 16, 2026
Release: Dec 9, 2025
Close: Jan 16, 2026
Replace old controllers, install new network switches, PTZ, integration to ATMS install new fiber at 20 signals. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis