Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Harris County
Work includes hydraulic lift replacement, maintenance and related items.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Harris County
Provide hydro-insensitive high density polyurethane foam material, installation and related items.
Posted Date
Nov 14, 2025
Due Date
Dec 1, 2025
Release: Nov 14, 2025
Harris County
Close: Dec 1, 2025
Provide hydro-insensitive high density polyurethane foam material, installation and related items.
AvailableHarris County
Provide smart cushion crash attenuator (CCA) system replacement and related items.
Posted Date
Oct 24, 2025
Due Date
Dec 1, 2025
Release: Oct 24, 2025
Harris County
Close: Dec 1, 2025
Provide smart cushion crash attenuator (CCA) system replacement and related items.
AvailableHarris County
Work includes asphalt roadway maintenance.
Posted Date
Nov 14, 2025
Due Date
Nov 24, 2025
Release: Nov 14, 2025
Harris County
Close: Nov 24, 2025
Work includes asphalt roadway maintenance.
AvailableCity of Grants
Installation of two new lift station structure, force main and service line. The installation of both new lift stations also includes new duplex pump with new controls, piping, and check valves. Installation of a new 2", 4", and 8" force main and 4" service line via open trench. The 2" force main installation includes the connection to an existing force main within existing collection system. Service line installation includes the connection to the existing cleanout found on the west side of the building. The 8" force main installation includes the connection to an existing force main connecting into Manhole #6001 West of Lift Station 2. The 4" force main installation includes the connection to an existing force main connecting into Manhole #6001 West of Lift Station 2.
Posted Date
Nov 10, 2025
Due Date
Nov 25, 2025
Release: Nov 10, 2025
City of Grants
Close: Nov 25, 2025
Installation of two new lift station structure, force main and service line. The installation of both new lift stations also includes new duplex pump with new controls, piping, and check valves. Installation of a new 2", 4", and 8" force main and 4" service line via open trench. The 2" force main installation includes the connection to an existing force main within existing collection system. Service line installation includes the connection to the existing cleanout found on the west side of the building. The 8" force main installation includes the connection to an existing force main connecting into Manhole #6001 West of Lift Station 2. The 4" force main installation includes the connection to an existing force main connecting into Manhole #6001 West of Lift Station 2.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis