Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Michael Site (41.16915, -76.22441) – Installation of (4) 50’ trees with canopy and root ball attached to be utilized for toe wood stabilization, installation of (3) 5’ diameter root balls with 20’ stem attached to be utilized for rootwad deflectors. Zagata/Good Site (41.165731, -76.227376) – Installation of (1) 7-section modified mud sill and, 2 logs high for bank stabilization.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
This solicitation requests bidders to perform emergency bank stabilization along San Francisquito Creek, including mobilization, access and staging development, temporary control measures, northbank stabilization (approximately 130 linear feet using boulder revetment and wrapped soil lifts), southern embankment repairs, and replacement of the Menlo Park storm drain outfall. The work also includes irrigation, revegetation, and 365-day landscape maintenance following substantial completion.
Posted Date
Dec 5, 2025
Due Date
Jan 8, 2026
Release: Dec 5, 2025
Close: Jan 8, 2026
This solicitation requests bidders to perform emergency bank stabilization along San Francisquito Creek, including mobilization, access and staging development, temporary control measures, northbank stabilization (approximately 130 linear feet using boulder revetment and wrapped soil lifts), southern embankment repairs, and replacement of the Menlo Park storm drain outfall. The work also includes irrigation, revegetation, and 365-day landscape maintenance following substantial completion.
AvailableThe City of Fairhope seeks qualified contractors for the Magnolia Beach Restoration and Stabilization Project, involving restoration of 650 linear feet of beach, placement of 7,700 cubic yards of sand, construction of rock headland breakwater structures, and installation of sod and sand fencing.
Posted Date
-
Due Date
Dec 18, 2025
Close: Dec 18, 2025
The City of Fairhope seeks qualified contractors for the Magnolia Beach Restoration and Stabilization Project, involving restoration of 650 linear feet of beach, placement of 7,700 cubic yards of sand, construction of rock headland breakwater structures, and installation of sod and sand fencing.
AvailableThe City of Fairhope seeks qualified contractors for the Magnolia Beach Restoration and Stabilization Project, involving restoration of 650 linear feet of beach, placement of 7,700 cubic yards of sand, construction of rock headland breakwater structures, and installation of sod and sand fencing.
Posted Date
-
Due Date
Dec 18, 2025
Close: Dec 18, 2025
The City of Fairhope seeks qualified contractors for the Magnolia Beach Restoration and Stabilization Project, involving restoration of 650 linear feet of beach, placement of 7,700 cubic yards of sand, construction of rock headland breakwater structures, and installation of sod and sand fencing.
AvailableAccepting sealed bids for shoreline stabilization. Shoreline stabilization would include the use of rip rap along approx 525ft of shoreline with approx 325 tons of rip rap. Shoreline stabilization (rip rap) shall be installed by boat.
Posted Date
Nov 10, 2025
Due Date
Jan 8, 2026
Release: Nov 10, 2025
Close: Jan 8, 2026
Accepting sealed bids for shoreline stabilization. Shoreline stabilization would include the use of rip rap along approx 525ft of shoreline with approx 325 tons of rip rap. Shoreline stabilization (rip rap) shall be installed by boat.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis