Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide qualified contractors for the demolition and set up of (1) one 2 bedroom/ 2 bathroom replacement mobile home.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide certified licensed roofers for the rehabilitation of one home.
Posted Date
Oct 31, 2025
Due Date
Dec 15, 2025
Release: Oct 31, 2025
Close: Dec 15, 2025
Provide certified licensed roofers for the rehabilitation of one home.
AvailablePremium
Access the largest public sector contact database
Work includes chiller replacement.
Posted Date
Oct 20, 2025
Due Date
Dec 30, 2025
Release: Oct 20, 2025
Close: Dec 30, 2025
Work includes chiller replacement.
AvailableThe approximate quantities for the principal items of work under this contract are: 1847 LF - 6" c-900, PVC water main; 105 LF - 6" hdpe pipe (dr11) (directional bore); 520 LF - 3/4" service line; 380 LF - 2" PVC encasement (bored); 16 each - water service reconnection (complete in place); 2 each - tie-in to existing water system; 4 each - 6" gate valve with box; 4 each - fire hydrant assembly (complete); 100 lf - saw cut pavement/driveways (variable depth); 125 SY - remove and replace asphalt pavement (crush stone); 100 SY - remove and replace concrete drive; 50 Y - remove and replace concrete sidewalk; 100 SY - remove and replace concrete curb & gutter; 100 SY - borrow excavation (class 9) (fm); 0.25 acres - seeding and mulching; 1 each - 6" tapping sleeve and valve with box; 7 each - tree removal, all sizes.
Posted Date
Aug 1, 2025
Due Date
Jan 13, 2026
Release: Aug 1, 2025
Close: Jan 13, 2026
The approximate quantities for the principal items of work under this contract are: 1847 LF - 6" c-900, PVC water main; 105 LF - 6" hdpe pipe (dr11) (directional bore); 520 LF - 3/4" service line; 380 LF - 2" PVC encasement (bored); 16 each - water service reconnection (complete in place); 2 each - tie-in to existing water system; 4 each - 6" gate valve with box; 4 each - fire hydrant assembly (complete); 100 lf - saw cut pavement/driveways (variable depth); 125 SY - remove and replace asphalt pavement (crush stone); 100 SY - remove and replace concrete drive; 50 Y - remove and replace concrete sidewalk; 100 SY - remove and replace concrete curb & gutter; 100 SY - borrow excavation (class 9) (fm); 0.25 acres - seeding and mulching; 1 each - 6" tapping sleeve and valve with box; 7 each - tree removal, all sizes.
AvailableRemoval and replacement of existing ice chiller equipment utilized in the preparation of ice skating rink surface ice. Removal and replacement of ice melting coil in the snow melting pit. Removal and replacement of ice melting coil in the snow melting pit. Installation of new heating and ventilation equipment to provide proper ventilation of the ice equipment room.
Posted Date
Oct 17, 2025
Due Date
Dec 12, 2025
Release: Oct 17, 2025
Close: Dec 12, 2025
Removal and replacement of existing ice chiller equipment utilized in the preparation of ice skating rink surface ice. Removal and replacement of ice melting coil in the snow melting pit. Removal and replacement of ice melting coil in the snow melting pit. Installation of new heating and ventilation equipment to provide proper ventilation of the ice equipment room.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis