Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Lansing Board of Water & Light (BWL) issued an RFP for furnishing pre-insulated hot water pipe materials to support its water distribution system in the greater Lansing area. The work includes supplying pre-insulated steel piping systems meeting EN 253, associated fittings/valves meeting EN 448, shop drawings and product data, training for installation vendors, and delivery by July 1, 2026. Proposals must be submitted through IonWave and include compliance affidavits and past experience; the solicitation was posted Dec 9, 2025 and is due Dec 16, 2025.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide 35 EA 1. 5"id/5" od pre-insulated steel hot water pipe; 20 EA 2" id/5.5" od pre-insulated steel hot water pipe; 7 EA 3" id/7" od pre-insulated 90 degree bends; 4 EA 6" id x 3" id pre-insulated steel reducer; 10 EA 6" id x 2" id pre-insulated 45 degree tees; 18 EA 2" id/5. 5" od pre-insulated ball valve; 52 EA 1. 5" id/5" od split sleeve electrofusion joint; 280 EA 2" id/5. 5" od split sleeve electrofusion joint; 174 EA 6" id/11" od split sleeve electrofusion joint.
Posted Date
Dec 9, 2025
Due Date
Dec 16, 2025
Release: Dec 9, 2025
Close: Dec 16, 2025
Provide 35 EA 1. 5"id/5" od pre-insulated steel hot water pipe; 20 EA 2" id/5.5" od pre-insulated steel hot water pipe; 7 EA 3" id/7" od pre-insulated 90 degree bends; 4 EA 6" id x 3" id pre-insulated steel reducer; 10 EA 6" id x 2" id pre-insulated 45 degree tees; 18 EA 2" id/5. 5" od pre-insulated ball valve; 52 EA 1. 5" id/5" od split sleeve electrofusion joint; 280 EA 2" id/5. 5" od split sleeve electrofusion joint; 174 EA 6" id/11" od split sleeve electrofusion joint.
AvailableProvide labor, materials, equipment, and supervision to repair and replace failed hot water tanks and associated components.
Posted Date
Nov 25, 2025
Due Date
Dec 18, 2025
Release: Nov 25, 2025
Close: Dec 18, 2025
Provide labor, materials, equipment, and supervision to repair and replace failed hot water tanks and associated components.
AvailableProvide hot water heaters and tanks.
Posted Date
Dec 12, 2025
Due Date
Jan 5, 2026
Release: Dec 12, 2025
Close: Jan 5, 2026
Provide hot water heaters and tanks.
AvailableChelsea Housing Authority is soliciting quotes from qualified mechanical/plumbing engineering firms to perform an electric-only Domestic Hot Water (DHW) Modernization & Leak-Risk Reduction Study for Buckley Apartments, a seven-story, 210-unit multifamily building at 14 Bloomingdale St, Chelsea, MA. The selected firm will inspect existing hot water tanks, evaluate options to reduce leak risk and modernize the system (including central hot water plant, heat-pump hot water, consolidation, or fixes), and provide cost estimates, pros/cons, energy impacts, and a final report with recommendations plus a presentation. Period of performance begins after contractor selection and the study must be completed by January 9, 2026.
Posted Date
Dec 10, 2025
Due Date
Jan 12, 2026
Release: Dec 10, 2025
Close: Jan 12, 2026
Chelsea Housing Authority is soliciting quotes from qualified mechanical/plumbing engineering firms to perform an electric-only Domestic Hot Water (DHW) Modernization & Leak-Risk Reduction Study for Buckley Apartments, a seven-story, 210-unit multifamily building at 14 Bloomingdale St, Chelsea, MA. The selected firm will inspect existing hot water tanks, evaluate options to reduce leak risk and modernize the system (including central hot water plant, heat-pump hot water, consolidation, or fixes), and provide cost estimates, pros/cons, energy impacts, and a final report with recommendations plus a presentation. Period of performance begins after contractor selection and the study must be completed by January 9, 2026.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis