Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
County of Henrico
The Work consists of the installation of approx. 185 LF feet of new 8" sewer, 153 LF of new 10" sewer, 442 LF of new 12" sewer, 45 LF of new 15" sewer, 75 LF of new 24" sewer and 7,220 LF of new 60" sewer and the abandonment of approx. 4,300 LF of existing 42" sewer. Also included in this project is the installation of 31 new 48", 84", 96", 108" and 120" manholes totaling approx. 625 vertical feet. It also includes three tunnel operations totaling approx. 3,600 LF and the provision of all associated bypass pumping, pavement restoration, erosion control, traffic control, and appurtenances.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Salt Lake City
Rehabilitation of approximately 6,982 feet of 48-inch and 64-inch sewer trunk line by cipp lining, replacement of 1,637 feet of 64-inch sewer trunk line with new 66-inch frp, replacement and rehabilitation of several existing manholes along the sewer trunk line, and all associated dewatering, bypass pumping, and lateral connections required to complete the work.
Posted Date
Oct 24, 2025
Due Date
Nov 21, 2025
Release: Oct 24, 2025
City of Salt Lake City
Close: Nov 21, 2025
Rehabilitation of approximately 6,982 feet of 48-inch and 64-inch sewer trunk line by cipp lining, replacement of 1,637 feet of 64-inch sewer trunk line with new 66-inch frp, replacement and rehabilitation of several existing manholes along the sewer trunk line, and all associated dewatering, bypass pumping, and lateral connections required to complete the work.
AvailableSanitation Districts Of Los Angeles County
Rehabilitate approx. 4,161' of existing corroded 18- and 24" dia. reinforced concrete pipe (RCP) and cracked vitrified clay pipe (VCP) on the joint outfall H unit 8L trunk sewer and the joint outfall H unit 8L relief trunk sewer with cured-in-place pipe liner and 14 manholes with a protective coating system and all appurtenant work.
Posted Date
Nov 5, 2025
Due Date
Dec 9, 2025
Release: Nov 5, 2025
Sanitation Districts Of Los Angeles County
Close: Dec 9, 2025
Rehabilitate approx. 4,161' of existing corroded 18- and 24" dia. reinforced concrete pipe (RCP) and cracked vitrified clay pipe (VCP) on the joint outfall H unit 8L trunk sewer and the joint outfall H unit 8L relief trunk sewer with cured-in-place pipe liner and 14 manholes with a protective coating system and all appurtenant work.
AvailableCity of Willard
The Project generally consists of approximately 400 lineal feet of 8-inch and 2,963 lineal feet of 15-inch gravity sewer including a bid alternate for a road bore with 24-inch casing and related appurtenances, 11 precast concrete manholes, one (1) fiberglass reinforced plastic flow metering manhole, an ultrasonic flow meter, and related electrical work and site work.
Posted Date
Oct 16, 2025
Due Date
Nov 21, 2025
Release: Oct 16, 2025
City of Willard
Close: Nov 21, 2025
The Project generally consists of approximately 400 lineal feet of 8-inch and 2,963 lineal feet of 15-inch gravity sewer including a bid alternate for a road bore with 24-inch casing and related appurtenances, 11 precast concrete manholes, one (1) fiberglass reinforced plastic flow metering manhole, an ultrasonic flow meter, and related electrical work and site work.
AvailableCity of Dayton
Work consists of sewer extension, includes 13,100 SY of rolled erosion prevention category 25; 2,500 LF of silt fence, type ms - maintained; 2,400 LF of bale barriers - maintained; 1,600 LF of improved pipe foundation; 1,036 LF of 12" pvc sanitary sewer pipe, sdr 26; 210 LF of 12" pvc sanitary sewer pipe, c900; 126 LF of 8" pvc sanitary sewer pipe, sdr 26; 64 cy of common excavation - offsite (ev) (p); 35 LF of 6: pvc sanitary service pipe, sch. 40; 20 LF of 4 ft dia. Sanitary structure overdepth; 3 ton of mulch material type 3. See outside link.
Posted Date
Nov 6, 2025
Due Date
Nov 25, 2025
Release: Nov 6, 2025
City of Dayton
Close: Nov 25, 2025
Work consists of sewer extension, includes 13,100 SY of rolled erosion prevention category 25; 2,500 LF of silt fence, type ms - maintained; 2,400 LF of bale barriers - maintained; 1,600 LF of improved pipe foundation; 1,036 LF of 12" pvc sanitary sewer pipe, sdr 26; 210 LF of 12" pvc sanitary sewer pipe, c900; 126 LF of 8" pvc sanitary sewer pipe, sdr 26; 64 cy of common excavation - offsite (ev) (p); 35 LF of 6: pvc sanitary service pipe, sch. 40; 20 LF of 4 ft dia. Sanitary structure overdepth; 3 ton of mulch material type 3. See outside link.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis