Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
University of Michigan Ann Arbor
Provide partial roof replacement.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
North Carolina A T State University
Partial roof replacement project of building. .
Posted Date
Nov 13, 2025
Due Date
Dec 12, 2025
Release: Nov 13, 2025
North Carolina A T State University
Close: Dec 12, 2025
Partial roof replacement project of building. .
AvailableVolusia County
Work includes construction of partial roof replacement.
Posted Date
Oct 23, 2025
Due Date
Dec 4, 2025
Release: Oct 23, 2025
Volusia County
Close: Dec 4, 2025
Work includes construction of partial roof replacement.
AvailableTown of Farmington
Work consists of a partial roof replacement to an existing building. Removal of existing membrane roofing, insulation, cant strips and tapered edges, and metal flashings. Offsite disposal of all removed materials. Removal and replacement of existing roof accessories. Removal and replacement of deteriorated roof decking and wood blocking. Removal and replacement of existing roof drains and related piping and insulation. Provision and installation of epdm membranes, underlayment, and flat and tapered insulations. Provision and installation of new flashings, caps, fasciae, and other trim metal work as detailed and specified.
Posted Date
Nov 5, 2025
Due Date
Dec 2, 2025
Release: Nov 5, 2025
Town of Farmington
Close: Dec 2, 2025
Work consists of a partial roof replacement to an existing building. Removal of existing membrane roofing, insulation, cant strips and tapered edges, and metal flashings. Offsite disposal of all removed materials. Removal and replacement of existing roof accessories. Removal and replacement of deteriorated roof decking and wood blocking. Removal and replacement of existing roof drains and related piping and insulation. Provision and installation of epdm membranes, underlayment, and flat and tapered insulations. Provision and installation of new flashings, caps, fasciae, and other trim metal work as detailed and specified.
AvailableCity of Altoona
Project consists of removal of damaged membrane roofing and topmost layer of insulation, installation of replacement insulation, new roofing, membrane flashings at penetrations, and terminations. The two roof areas total approx 5,650 SF, at the north end of the complex.
Posted Date
Nov 5, 2025
Due Date
Nov 19, 2025
Release: Nov 5, 2025
City of Altoona
Close: Nov 19, 2025
Project consists of removal of damaged membrane roofing and topmost layer of insulation, installation of replacement insulation, new roofing, membrane flashings at penetrations, and terminations. The two roof areas total approx 5,650 SF, at the north end of the complex.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis