Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
High voltage 38 kv maintenance testing and inspection.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide high and medium voltage switchgear maintenance for the department of real estate and asset management.
Posted Date
Dec 4, 2025
Due Date
Dec 18, 2025
Release: Dec 4, 2025
Close: Dec 18, 2025
Provide high and medium voltage switchgear maintenance for the department of real estate and asset management.
AvailablePremium
Access the largest public sector contact database
Athletic surface inspection includes but is not limited to the assessment and inspection of new and existing natural grass turf, all weather turf (synthetic), basketball courts (indoor/ outdoor), volleyball courts (indoor/ outdoor), racquetball courts (indoor/ outdoor), tennis courts, running tracks, playground surfacing and golf greens. Surfaces include, but are not limited to, acrylic color coatings, polyurethane coatings, synthetic and natural clay surfaces. Testing of athletic surfaces will include but is not limited to: gmax (astm f1936 and f355a) gives an indication of high impact shock absorption. , shock absorption and vertical deformation: measures the impact absorption provided by synthetic turf to a player running (lower extremity impact) or falling on as well as the foot stability of the surface as a player runs across it. Excess deformation of a surface could lead to over strained joints and fatigue.
Posted Date
Oct 15, 2025
Due Date
Dec 22, 2025
Release: Oct 15, 2025
Close: Dec 22, 2025
Athletic surface inspection includes but is not limited to the assessment and inspection of new and existing natural grass turf, all weather turf (synthetic), basketball courts (indoor/ outdoor), volleyball courts (indoor/ outdoor), racquetball courts (indoor/ outdoor), tennis courts, running tracks, playground surfacing and golf greens. Surfaces include, but are not limited to, acrylic color coatings, polyurethane coatings, synthetic and natural clay surfaces. Testing of athletic surfaces will include but is not limited to: gmax (astm f1936 and f355a) gives an indication of high impact shock absorption. , shock absorption and vertical deformation: measures the impact absorption provided by synthetic turf to a player running (lower extremity impact) or falling on as well as the foot stability of the surface as a player runs across it. Excess deformation of a surface could lead to over strained joints and fatigue.
AvailableChemical and smoke purge system maintenance, inspection, and repair services.
Posted Date
Dec 11, 2025
Due Date
Jan 12, 2026
Release: Dec 11, 2025
Close: Jan 12, 2026
Chemical and smoke purge system maintenance, inspection, and repair services.
AvailableProvide fire alarm monitoring, testing, inspection and preventive maintenance services.
Posted Date
Nov 18, 2025
Due Date
Jan 30, 2026
Release: Nov 18, 2025
Close: Jan 30, 2026
Provide fire alarm monitoring, testing, inspection and preventive maintenance services.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis