Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 02a demolition, 03a concrete, 04a masonry, 05a structural and misc. Steel, 06a framing, 06b wood trusses, 07a not used 07b insulation, 07c roofing, 08a doors, frames, and hardware, 08b windows, glass and glazing, 09a acoustical ceilings, 09b flooring, 09c gypsum board assemblies, 09d painting and finishing, 10a building accessories, 22a plumbing, 23a HVAC and HVAC controls, 26a electrical, 27a communications cabling system, 28a fire alarm system.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Replace the TPO roof at the public safety complex. Remove and store the existing lightning protection items in this area, as required.
Posted Date
Nov 12, 2025
Due Date
Dec 15, 2025
Release: Nov 12, 2025
Close: Dec 15, 2025
Replace the TPO roof at the public safety complex. Remove and store the existing lightning protection items in this area, as required.
AvailablePremium
Access the largest public sector contact database
Request for a Construction Manager at Risk (CMAR) to provide pre-construction, construction and close-out services under a Guaranteed Maximum Price for Part I: a new 2‑story ~30,500 sf North Kingstown Public Safety Complex (Quonset Business Park) and Alternate #1 Part II: a new 1‑story ~20,200 sf North Kingstown Fire Department — Station 1 (8150 Post Road). Estimated costs: Part I ~$29.0M; Part II ~$21.5M. Proposals must include a CM qualifications package, fee/GMP proposal, acceptance of AIA A133/A201-based contract terms, and sealed hard-copy submission; a mandatory pre-proposal/site conference is required.
Posted Date
Nov 21, 2025
Due Date
Dec 19, 2025
Release: Nov 21, 2025
Close: Dec 19, 2025
Request for a Construction Manager at Risk (CMAR) to provide pre-construction, construction and close-out services under a Guaranteed Maximum Price for Part I: a new 2‑story ~30,500 sf North Kingstown Public Safety Complex (Quonset Business Park) and Alternate #1 Part II: a new 1‑story ~20,200 sf North Kingstown Fire Department — Station 1 (8150 Post Road). Estimated costs: Part I ~$29.0M; Part II ~$21.5M. Proposals must include a CM qualifications package, fee/GMP proposal, acceptance of AIA A133/A201-based contract terms, and sealed hard-copy submission; a mandatory pre-proposal/site conference is required.
AvailableThe City of Aurora seeks a contractor to construct bikeway improvements along S. Havana Street in Colorado. Work is expected to include roadway/bikeway construction elements and related improvements as specified in the bid documents.
Posted Date
Nov 18, 2025
Due Date
Dec 19, 2025
Release: Nov 18, 2025
Close: Dec 19, 2025
The City of Aurora seeks a contractor to construct bikeway improvements along S. Havana Street in Colorado. Work is expected to include roadway/bikeway construction elements and related improvements as specified in the bid documents.
AvailableNew transportation complex.
Posted Date
Nov 24, 2025
Due Date
Jan 14, 2026
Release: Nov 24, 2025
Close: Jan 14, 2026
New transportation complex.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis